Archive for November, 2009

Nov 27 2009

Orkuveita Reykjavíkur Losing on Sale to Magma


Orkuveita Reykjavíkur (Reykjavík Energy Company) has lowered the value of a deed issued when Magma Energy bought the companies stocks in H.S. Orka (geothermal energy company). In a statement from OR it states that a lovering of the deed values was made to be in unison with international acounting standards.

Sigrún Elsa Smáradóttir, representative of the Social Democratic Union party in the board of OR announced that the estimated loss because of the stock trade is going to be 4 billion ISKR. There’s reason to believe that the value of the deeds Magma issued is overestimated as well, which will see even further loss come from the sale.

There was huge opposition against the sale from the start and the at the City Council meeting where the voting for the sale took place about 100 people demonstrated and shouted in protest from the balconies. Read more about this here and here.

The majority of the City Council spoke strongly for the sale and the profits that it would reap them, claiming the value to become 6.31 a stock. But the miniorities overlooked critique of the ridiculous loaning agreement has already proven to be true. The 3rd quarter accounts prove this and show that the stock value has fallen to 5.4.

Nov 27 2009

Is Heavy Industry the Way Out of the Economic Crisis?


By Indriði H. Þorláksson – Economist

The economic effects of heavy industry must take into account both short and long term economic policies.

Statements put forth without reasoning sometimes obtain more significance than they merit. Two such statements that are held aloft about the building of energy plants and heavy industry are particularly dangerous.

On the one hand that they are necessary and that they might even be the way out of the crisis and on the other that the future of the Icelandic economic system is best insured by utilizing energy resources and with heavy industry. One looks to the short term and the other to the long term but both are questionable, probably wrong and even dangerous.

The economic impact of heavy industry must take into account both short and long term economic policies, In the short term, say 3-5 years the goal is to restart the economy. In the long term the goal is to promote growth in the economic system to provide citizens with the good things in life. To do so the economy has to provide the highest augmented value to the nation for its work, capital and resources.

Read More

Nov 24 2009

Government and Interested Parties Wage a War Against Iceland’s Wilderness


Reykjanes Peninsula Geological MapLast Saturday, November 21st, Jóhanna Sigurðardóttir, Iceland’s prime minister and the head of Samfylkingin (social democratic populist party), said that she is completely sure that all hindrances that could possibly stand in the way of the construction of Suðvesturlína (electricity lines) will be removed as soon as possible. Suðvesturlína is supposed to transport energy from the Hellisheiði geothermal powerplant (south of Reykjavík) and other energy sources to the Reykjanes peninsula, e.g. to run Century Aluminum’s new 360 ton smelter, which is currently being built in Helguvík.

At the same opportunity, Sigurðardóttir announced her hopes for that Landsvirkjun (Iceland’s national energy company) could start construction of Búðarhálsvirkjun hydro-dam in Tungná river, early next spring. The energy from there is supposed to run increased aluminium production in Rio Tinto-Alcan’s smelter in Hafnarfjörður. Sigurðardóttir said that employment affairs must be the biggest issue for social democtrats in the upcoming regional elections that will take place in the spring of 2010. She raised her voice for the necessity of increased development with the help of “eco-friendly” energy sources.

Read More

Nov 17 2009
4 Comments

Development of Iceland’s Geothermal Energy Potential for Aluminium Production – A Critical Analysis


By Jaap Krater and Miriam Rose
In: Abrahamsky, K. (ed.) (2010) Sparking a World-wide Energy Revolution: Social Struggles in the Transition to a Post-Petrol World. AK Press, Edinburgh. p. 319-333

Iceland is developing its hydro and geothermal resources in the context of an energy master plan, mainly to provide power for expansion of the aluminium industry. This paper tests perceptions of geothermal energy as low-carbon, renewable and environmentally benign, using Icelandic geothermal industry as a case study.
The application of geothermal energy for aluminium smelting is discussed as well as environmental and human rights record of the aluminium industry in general. Despite application of renewable energy technologies, emission of greenhouse gases by aluminium production is set to increase.
Our analysis further shows that carbon emissions of geothermal installations can approximate those of gas-powered plants. In intensely exploited reservoirs, life of boreholes is limited and reservoirs need extensive recovery time after exploitation, making geothermal exploitation at these sites not renewable in the short to medium term. Pollution and landscape impacts are extensive when geothermal technology is applied on a large scale.

Krater and Rose – Development of Iceland’s Geothermal Energy – Download as PDF
The full publication will be available from Jan. 15, 2010. ISBN 9781849350051.

Nov 14 2009
18 Comments

Welcome!


Welcome to SavingIceland.org! If you are new to our site you can begin with having a quick look at the About Us section and then read the S.O.S. and the  Saving Iceland Mobilisation Call-Out. Iceland Under Threat shows the wilderness we need to protect and the corporations bent on ruining it. Make sure to enjoy our video and photo galleries, our in-depth magazine Voices of the Wilderness and follow our Twitter feed to keep up to date. And last but not least get some answers to Frequently Asked Questions.

Náttúruvaktin