Author Archive

Jul 09 2007
9 Comments

SUMMER OF INTERNATIONAL DISSENT AGAINST HEAVY INDUSTRY


Hreindyr     

Hálslón, Kárahnjúkar, October 2006

A summer of International dissent and action against Heavy Industry – swarming around Iceland from the 6th of July 2007

Updated July 10th. The campaign to defend Europe’s vastest remaining wilderness continues. After the direct action camps in Iceland’s mountain highlands in the summers of 2005 and 2006 against the Kárahnjúkar dam and ALCOA’s Reydarfjordur aluminium smelter, the Saving Iceland campaign moves on to bring Iceland’s aluminium Heavy Industrialisation to a halt.

New plans for dams, power plants, aluminium smelters and other forms of heavy industry need to be stopped. The culprits include corporations such as ALCOA, ALCAN, Century Aluminum, Hydro, Rusal, Impregilo, Bechtel, Barclays, Mott McDonald, etc… Iceland, with it’s vast geothermal and megahydro possibilities, is a new frontier for cheap energy craving industrial moguls who see nothing worth saving in Iceland’s legendary wilderness.

This camp will bring together activists from all over the world, including activists from social movements in India, South America, Africa, Europe and North America. Stopping the industrialisation and ecological destruction of the last unspoilt country in the west would be a major victory for the green movement and a new incentive for a global movement against industrialisation and ecocide. Join us. Read More

Jul 08 2007

Stóriðjusinnar iðrist! – Reverend Billy to Exorcise Heavy Industry in Iceland!


Takið þátt í einstæðri athöfn fyrir sálarheill þjóðarinnar þar sem Séra Reverend Billy mun særa á brott orkusugur og illa anda stóriðju.

Athöfnin mun fara fram 10. júlí í Kringlunni, musteri græðginnar, og hefst kl. 12.00.

The one and only Reverend Billy from the Church of Stop Shopping shall lead a flock of anti heavy industry activists through the pits of Heavy Industry hell in Iceland.

The preacher calls upon you to join him at noon of the 10th of July, Krínglan shopping mall, Reykjavik, Tuesday July 10th, 12:00!
Read More

Jul 05 2007

Saving Iceland Mega Concert – NASA- 2 July


Featuring Múm, Ólöf Arnalds, Rúnar Júl, Bogomil Font og félagar, Magga Stína, Ellen Eyþórs, Mr. Silla og Mongoose, Bloodgroup, Evil Madness, Skátar, Retro Stefsson, Strakovsky Horo, Dimma, Reykjavík, Velvet Ego, Dj Árni Sveins and Captain Tobias Hume.

Read More

Jul 04 2007

ALCAN and Mayor decide: To Hell with Democracy in Hafnarfjördur!


Update: ALCAN say the Mayor of Hafnarfjordur suggested the landfill. The Mayor says ALCAN suggested it. One of them must be lying…

Read More

Jul 02 2007

Role of River-Suspended Material in the Global Carbon Cycle


Sigurdur R. Gislason, Eric H. Oelkers, and Árni Snorrason

Geological Society of America
Volume 34, Issue 1 (January 2006)
Article: pp. 49–52
Volume 34, Issue 1 (January 2006)
Article: pp. 49–52

Abstract:

1. Institute of Earth Science, University of Iceland, Sturlugata 7, 101 Reykjavík, Iceland, 2. Géochimie et Biogéochimie Experimentale—LMTG/Université Paul Sabatier, 14 rue Edouard Belin, 31400 Toulouse, France, 3. National Energy Authority, Grensásvegi 9, 108 Reykjavík, Iceland

The reaction of Ca derived from silicate weathering with CO2 in the world’s oceans to form carbonate minerals is a critical step in long-term climate moderation. Ca is delivered to the oceans primarily via rivers, where it is transported either as dissolved species or within suspended material. The relative importance for climate moderation of riverine dissolved Ca vs. suspended Ca transport stems from the total Ca flux and its climate dependence. Data in the literature suggest that, within uncertainty, global riverine dissolved Ca flux is equal to suspended material Ca flux. To determine how these fluxes depend on temperature and rainfall, a 40 yr field study was performed on 4 catchments in northeastern Iceland: Jökulsá á Fjöllum at Grímsstadir, Jökulsá á Dal at Brú, Jökulsá á Dal at Hjardarhagi, and Jökulsá í Fljótsdal at Hóll. Suspended material Ca flux depends more on seasonal and annual temperatures and rainfall variation than does dissolved Ca flux in all four catchments. For example, the average difference between the annual maximum and minimum daily suspended Ca flux for the Jökulsá á Dal at Brú is four orders of magnitude, whereas the difference for dissolved Ca flux is only approximately one order of magnitude. Similarly, the annual dissolved Ca flux for this river varies by a factor of 2.6, whereas its annual suspended Ca flux varies by a factor of 7.1. Because suspended material Ca flux is more dependent on climate, it provides a stronger negative feedback for stabilizing Earth’s temperature through the greenhouse effect. Read More

Jul 02 2007

Review: Saving Iceland Mega Concert


Múm

Grapevine.is
Valgerður Þóroddsdóttir
Issue 10, July 13, 2007

Who: Various artists Where: NASA When: July 2, 2007

A barefoot girl with long blonde hair reaching down to her lower back was dancing enthusiastically to the deserving catchy beats of Retro Stefson when I entered NASA on a slow Monday night. In front of and around her people were leisurely sprawled across the floor, many sitting Indian style, patiently watching as the Stefson teens effortlessly spun out their unpretentious, soulful and enchanting pop.

Organised by the campaign group Saving Iceland as a protest and fundraiser against large-scale industrial projects in Iceland, the concert had drawn a crowd and an atmosphere certainly unfamiliar to the nightclub. Giant banners on each side of the dance floor protested Landsvirkjun, the national electric company, and their funding of the Kárahnjúkar hydropower plant under construction in eastern Iceland, a plant that will power an enormous aluminium smelter in Reyðarfjörður. Read More

Jun 17 2007

The National Theatre Adorned with Iceland’s New Flag.


Thjodleikhusbanner

17 June 2007

The National Theatre is adorned with Iceland’s new flag.

At around 4pm on Sunday 17th June, National Day, a giant new Icelandic flag was revealed from the roof of the National Theatre, located on Hverfisgata, facing the Arnarholl on Lækjargata where thousands of people stood for the festivities. The flag, which was 25m long, had a shield with the logos of the alluminum companies: ALCOA, ALCAN and Norðurál (also known as Century Aluminum) in the centre of a new Icelandic flag. The activists wished to express that far from being an independant nation, Iceland has been taken over by the aluminium industry with all the democracy defecit that comes with such powerful corporations. Read More

May 22 2007
1 Comment

Rising Ecocide: Nests Swallowed by Water at Kárahnjúkar


nest

The surface of Hálslón, the reservoir by Kárahnjúkar dams in Iceland’s eastern highlands, is constantly rising, swallowing nests and eggs laid by geese. The area is the nesting ground for greylag geese amongst numerous other species of rare and endangered birds. At least 500 greylag nests are thought to be at risk.

According to newspaper Morgunbladid, the birds have not yet realized the changes of their summer habitat, which happened when the glacial river Jökulsá á Dal was blocked last autumn to create Kárahnjúkar dam and Hálslón reservoir. This is to provide energy for an ALCOA owned aluminium smelter in nearby fjord, Reydarfjördur.

A protected area, Kringilsárrani, is also being partly drowned and devastated in full by the project. It is the calving ground of a third of Iceland’s reindeer population, which will be displaced.

The Kárahnjúkar area is the most densely vegetated area north of Vatnajökull, the world’s largest non-arctic glacier. Sixty major waterfalls are being destroyed and innumerable unique geological formations drowned, along with the just recently discovered ancient ruins of Reykjasel, about the most important archaeological find in Icelandic history.

The Kárhnjúkar project entails blocking the silt emissions of two massive glacial rivers, Jökulsá á Dal and Jökulsá í Fljótsdal. This will result in the receding of the combined delta of the two rivers. This will destroy a unique nature habitat in the delta and cause the loss of one of Iceland’s major seal colonies.

seal3

The Kárahnjúkar dams are situated on a cluster of active geological fissures. The government withheld geological reports from parliament when voting on the dams took place.

Campos Novos, a dam in Brazil of similar design, cracked in June 2006. Yet, Campos Novos was built on stable ground. Leading Icelandic geologists to consider the Kárahnjúkar dams a major threat to the local population.

The project was opposed by the Icelandic National Planning Agency due to too much irreversible environmental impact and insufficient evidence for the economic benefits of the project. The verdict of the NPA was overruled by the Minister of the Environment, Siv Fridleifsdóttir.

It is typical for the dishonest methods of the National Power Company (Landsvirkjun) that they pretend that the EIA they present on their Kárahnjúkar website is anything other than their own slanted PR job. You can read the real thing here: ‘Conclusion of the Environmental Impact Assessment of the Kárahnjúkar Project’
The Icelandic National Planning Agency

It is expected that the inundation will be complete in the autumn of 2007. The water levels of the reservoir will fluctuate and the dry dusty silt banks will cause dust storms that will affect the vegetation of over 3000 sq km. It has been estimated that the reservoir will silt up in as little as 40-80 years, leaving a desert where there was one of the most biologically diverse regions of the Icelandic highlands.

So much for the claims of Landsvirkjun and ALCOA that this provides “renewable” and “sustainable” energy!

submerged vegetation

ALCOA are adding insult to injury by demanding another smelter in the north of Iceland. This would entail the destruction of numerous geothermal fields and several major glacial rivers in the north.

ALCOA may think that they will get away with this vandalising of the Icelandic environment and that they can force their presence upon Iceland, against the will of half the nation. They are wrong.

ALCOA are not likely to be forgiven for Kárahnjúkar. Through this project ALCOA have gained many new enemies, both Icelandic and international. In due time these are sure to make ALCOA pay a heavy price for this ecocide.

Beautiful slideshow of the Jokulsa a Bru in all its living wonder, Kárahnjúkar and Töfrafoss in August 2006, just before the inundation. Photos by Christopher Lund. Music by Damien Rice.

For the ecological impact of hydropower reservoirs and glacial rivers see the following articles:

‘Hydropower Disaster for Global Warming’ by Jaap Krater

‘Glacial Rivers Reduce Pollution on Earth’ by Gudmundur Páll Ólafsson

Hydroelectric Power’s Dirty Secret Revealed

For other articles about the environmental impact of the Kárahnjúkar dams see ‘Destroyed Areas’

Campos Novos CU

Campos Novos

May 19 2007

Victory over ALCOA in Brazil!


During a meeting today with the Pará State Secretary of the Environment, Valmir Gabriel Ortega, the State and Federal Public Prosecutors Offices requested cancellation of the environmental license granted to Alcoa to mine bauxite in the municipality of Juruti. In an exclusive interview with the Amazonia website, the coordinator of the State Public Prosecutors Office (MPE) Environmental Center, Prosecutor Raimundo Moraes, explained that the decision to request suspension aims at averting a violent reaction by the local population, which wants the company to leave at any cost, and also to conduct a rigorous review of the license.

Although mining operations are only scheduled to begin in 2008, during public hearings held on May 2nd and 3rd, the community claims that it is already suffering impacts from construction of lodgings for employees of the multinational, a port and a road.

Moraes said, “the impacts are so obvious that Alcoa has not denied any of them. Alcoa said it was correcting the problems and recognized that it does not enjoy good relations with the community”. Moraes, however, stated that the problems run deep and will not be set straight with just repairs.Impacts One of the main complaints raised at the hearings is contamination of the waters in rivers that flow through the town.

Technical studies detected the presence of feces coliforms in Jará Lake, which supplies water to the municipality, and data from the municipal health department show that cases of viral hepatitis, caused by ingesting water contaminated by human feces, jumped from 26 in 2006 to 121 in the first four months of this year. The community accuses Alcoa of not performing proper treatment on sewage from the lodging of its employees. Moreover, Incra representatives present at the meetings presented pictures and other documents that prove that the company is conducting deforestation in areas not authorized inside the Juruti Velho and Socó Agro-extractivist Settlement Projects.

Another complaint is the increased expenses of public agencies, which are faced with increased demands for health, education and infrastructure. “If, after the review is conducted, Alcoa can act correctly, alright, otherwise it would be best for them to leave, as we do not need to bear these costs. It is unfair that they keep the riches produced here and we keep the burdens”, says Moraes.

The prosecutor believes that the population has shown its lack of trust in the company and accuses the multinational of trying to upset the hearings. “They tried to co-opt leaders, offering 10 jobs to each community”.

License

The preliminary license for installation of the Alcoa plant was granted by the State Environmental Council (Coema) in 2005. At the time, the representative of the State Public Prosecutors Office (MPE) voted against the authorization. Soon afterward, the agency, together with the Federal Public Prosecutors Office (MPF), filed a class action suit petitioning for the suspension of the company’s activities in the region.

The hearings this week were attended by the coordinator of the MPE Environmental Center, Prosecutor Raimundo Moraes and Federal Attorney Daniel César Azeredo Avelino, who commands the (Federal Public Prosecutors Office (MPF) in Santarém. Members from both agencies also visited the affected locations.

By Renata Gaspar
Link: http://www.amazonia.org.br

May 10 2007

Routine Corruption Delayed Until After Elections!


BB

Bjorn Bjarnason

Read More

Náttúruvaktin