Hellisheiði: A Geothermal Embarrassment


While driving Iceland’s national ring road, in a southerly direction from Reykjavík, one cannot miss noticing the steam coming up from an extraordinarily grey infrastructure covering a large piece of land around mount Hengill, approximately 30 km from the capital. Filled with roads, drills, pipelines, and a large powerhouse, this once untouched geothermal area is now the site of the Hellisheiði geothermal power plant, operated by the publicly owned Reykjavík Energy (“Orkuveita Reykjavíkur” in Icelandic, abbreviated “OR”), generating electricity almost entirely for aluminium production.

Geothermal energy is commonly praised as a “green” alternative to environmentally unfriendly power sources such as fossil fuels, coals and nuclear energy. As a result of “the development of what were once thought to be non-viable resources”, a glossy brochure from engineering firm Mannvit states, “more and more public and private entities are looking into geothermal power as part of their strategy to mitigate global warming while still meeting growing energy demands.” In a promotional text for the Geothermal Energy Exhibition at Hellisheiði, the plant is said to be a “striking example of how geothermal energy is harnessed in a sustainable manner in Iceland and a showcase for the rest of the world.” Additionally, Reykjavík Energy has not hesitated maintaining that “general public opinion of exploiting the geothermal resources in the Hengill region is positive.”

So many men, so many minds. Only about ten kilometres away from the plant stands the small town of Hveragerði, wherein one gets to hear a completely different story. “We cannot accept that OR will be permitted to continue polluting the atmosphere,” Hallgrímur Þ. Magnússon, clinical doctor in Hveragerði said to newspaper DV last June. A few days earlier he had voiced his worries to local newspaper Sunnlenska, encouraging the town’s residents to start taking magnesium and iodide supplements to counteract the health impacts of the power plant’s sulphur (hydrogen sulphide) pollution. “I maintain that the pollution is of such quantity that the human body needs those two materials in order to resist the effects,” Hallgrímur said to Sunnlenska.

Recent inspection makes it clear that the sulphur pollution, which does not only reach to Hveragerði but also to Reykjavík, often goes far above Icelandic and international standards. In the case of Hveragerði, the quantity of polluting materials in the atmosphere is such that the town should be considered within the plant’s dilution area (the area in which residential homes are not permitted).

EFFLUENT LAGOONS AND MANMADE EARTHQUAKES

Unfortunately for the burgeoning and PR heavy Icelandic energy sector, the green image of geothermal power has been repeatedly challenged lately. In particular regarding the country’s and, in fact, the world’s biggest geothermal plant at Hellisheiði. Two new unplanned effluent lagoons were recently discovered close to the plant, where waste water from geothermal pumping had leaked out onto the surface. Environmentalist and journalist Ómar Ragnarsson, who originally discovered the lagoons, followed the story by publishing his own photographs of similar lakes created by other geothermal plants, such as those by the plants at Reykjanes, Svartsengi, Nesjavellir and Bjarnarflag1. These lakes can be very dangerous to local freshwater systems, as Saving Iceland’s Jaap Krater and Miriam Rose explain in a book chapter on the development of geothermal harnessing in Iceland:

Geothermal fluids contain high concentrations of heavy metals and other toxic elements, including radon, arsenic, mercury, ammonia and boron, which are damaging to the freshwater systems into which they are released as waste water. Arsenic concentrations of 0.5 to 4.6 ppm are found in waste water released from geothermal power plants; the WHO recommends a maximum 0.01 ppm in drinking water.2

Yet another backlash for the geothermal industry is a recent study, carried out by Hanne Krage Carlsen, whose results were published in the international Environmental Research journal earlier this year3. The study shows a direct link between the plant’s sulphur pollution and increased purchase of asthma medicine among the residents of the greater Reykjavík area. New examination of vegetation in the Hellisheiði area also shows that the sulphur pollution has damaged large quantities of moss, which according to Magnea Magnúsdóttir who carried out the examination, will take decades to recover4. OR claims that the results of the plant’s Environmental Impact Assessment “indicate that construction of the plant will not have a lasting influence on the area’s vegetation” — something which, according to this recent information, needs to be questioned.

POLLUTION ABOVE GUIDELINE LIMITS

During OR’s Annual General Meeting (AGM) last June, it was revealed that Hveragerði is inside an area wherein sulphur (hydrogen sulphide) pollution is above the current guideline limits. New rules are supposed to go through in 2014, according to which the guideline limits will be strict 50 micrograms per square-meter per 24 hours. The authorities will also be obliged to alarm the public each time the pollution goes above that limit.

Though they admit the plant’s high concentration of polluting emissions, OR has said that the company will not able to adapt to the new rules until 2019 at the earliest. Therefore, the company will ask for an exception, to which the people of Hveragerði are heavily opposed. In an interview with Iceland’s National Broadcasting Service (RÚV), the town’s Mayor Aldís Hafsteinsdóttir protested against the company’s request, stating that OR had obviously rushed way too fast when preparing and building the plant and thus underestimated its environmental impacts. In a separate interview with Saving Iceland’s Miriam Rose this June, Aldís emphasized this point:

We feel very much like victims of all of this. This town has been here for 70 years and the power plant has only been here for 10 or 15. They should have considered the effects on the neighbourhood they were putting it in. It is absolutely obvious that the plant is situated too close to our town, as there are so many impacts that affect daily life here in Hveragerði.

Adding fuel to such criticism, Minister of the Environment Svandís Svavarsdóttir followed in the footsteps of many environmentalists and told RÚV, in an interview last June, that OR had been nothing but the puppet of heavy industry for the last years. That explains not only the company’s poor financial situation but also the environmental catastrophe at Hellisheiði, Svandís said. Mayor Aldís agrees: “They [OR] have sold their energy to the aluminium smelters way too cheap and now they can’t afford to reduce their pollution. That is, in my opinion, the reason why they are trying to stop the new regulations.”

DILUTION AREA: BIGGER THAN OF ALUMINIUM SMELTERS

The Hellisheiði plant started operating in 2006 and has since then seen two expansions, in 2008 and 2011, leading to increased sulphur pollution. Most of the energy goes to the aluminium smelter in Grundartangi, owned and operated by the North-American Century Aluminium, which then again is owned by mining and commodities giant Glencore.

Demonstrating Iceland’s haphazard approach to the development of geothermal energy, the Hellisheiði power plants’ dilution area has yet to be defined after six years of operation. However, it is clear from recent evidence that the dilution areas for geothermal plants should be much larger than for other polluting industries in Iceland — much bigger, for instance, than Rio Tinto Alcan’s aluminium smelter in Straumsvík and Century’s in Grundartangi, as reported by newspaper Morgunblaðið in June5. During OR’s recent AGM, their environmental director Hólmfríður Sigurðardóttir, admitted that she could not guarantee that the health of people living inside the area where pollution is above guideline limits (i.e. people living inside the dilution area) is not negatively affected by the pollution. Permanent residence is, in fact, prohibited inside such areas by law and land use is restricted to several limitations.

Interestingly, the Environmental Impact Assessment (EIA) for the Hellisheiði power station, carried out by engineering firm VGK on behalf of OR, overlooked the potential impacts on Hveragerði altogether, though it did take into consideration the negligible impacts on Þorlákshöfn and other towns much further away from the plant.

In September 2011 more than 1500 earthquakes were felt in Hveragerði in a single day, with other quakes going on for several weeks, some up to 4 on the Richter scale6. At first OR denied any culpability in the incident, though the residents immediately recognised the quakes as being unusual as many were focused on a single spot. However, after a few days they admitted that they had been pumping geothermal effluent water back into the ground, which is necessary to prevent surface pollution, but is well known by geologists to be a cause of man-made earthquakes. OR responded to the resident’s outrage over the quakes by holding a public meeting in which they claimed they were simply speeding up the release of earthquakes that would have happened anyway in the future. To this local resident Einar Bergmundur stood up and stated: “That is a very good argument. I am also sure I am going to die one day, but that doesn’t give you the right to kill me today to speed the process up?”

THE GUINEA PIGS OF HVERAGERÐI

In January this year some residents of Hveragerði started experiencing breathlessness, coughing and nausea as well as a strong sulphurous smell. They called Aldís to ask what was going on. Thanks to a monitoring site the residents had requested OR to install on their kindergarten, Aldís was able to see that hydrogen sulphide levels had persistently been in the hundreds of micrograms for more than a week. One day they had reached 337µg, more than double the current regulations, and almost seven times higher than the new regulations would allow. With the man-made earthquakes still on their minds, the residents were furious. Aldís told us that despite this breach of regulations no action seems to have been taken by OR:

I just can’t believe that this is how it is supposed to be — that the locals are supposed to monitor these levels themselves. There must be some institution that is supposed to take care of the people and make sure that we are not breathing this. But it did not happen. We live here, we have kids, the elderly are fragile and some have bad lungs. They [OR] are experimenting with these technologies as they build the plants. If they wanted to use us, the inhabitants of Hveragerði as guinea pigs they should have asked us first and not let everything that has happened here come as a surprise. They must have known better before they started this project and that is a fact the makes us angry. Our experience of the Hellisheiði power plant teaches us that not a single plant should be built here in the vicinity before they have a complete control of those matters that have gone wrong in Hellisheiði.

In response to such criticism, OR published a press releases claiming that there are no health risks at that level of exposure and that much of the science which says so is contended. They invite people to visit the plant and breathe the fumes, and even suggest that up to 14,000µg of Hydrogen Sulphide is acceptable to breathe for up to 8 hours7.

The World Health Organisation (WHO) does not agree. They state that concentrations above 280µg can cause breathing problems, followed by eye irritation at 500µg, loss of energy and increased lactic acid in the blood at 700µg, and finally headaches, irritability, dizziness, memory loss and fatigue at 2800µg. By 14,000µg people tend to suffer “olfactory paralysis” — a shut down of sense of smell which prevents them from noticing the odour and accompanying dangers. The WHO recommends a maximum guideline of 150 µg/m3 for a 24 hour period to ensure “the absence of appreciable risks that can cause adverse health effects” whereas the Californian regulation limits Hydrogen Sulphide emissions to 43 µg/m3 for more than an hour to prevent strong smell8. Iceland’s current regulations are weak by international standards and even these weak standards are not being enforced.

In the same press release OR presented a diagram of emissions from Hellisheiði showing that 99.49% of the steam released from the power plant is made up of water, while only 0.42% is CO2 and 0.08% Hydrogen Sulphide. This is a clear attempt at greenwashing the reality, as it is self evident that steam is largely made up of water and that this is not how sulphur concentrations in the environment are measured. These widely broadcast figures try to downplay well established science in what Aldís called “an insult to the intelligence of the people of Hveragerði.”

REYKJAVÍK’S CITY COUNCIL OPERATING AGAINST ITS OWN POLICY

Yet another 90 MW expansion is now planned in the area of Hverahlíð, south of the Hellisheiði plant and even closer to Hveragerði. The Hverahlíð plant is supposed to generate energy for another Century smelter, which currently stands half built and collecting dust in Helguvík, close to the Keflavík International Airport. The Helguvík project has been criticised from the beginning of its construction in 2008, not only for environmental reasons but also for the major energy uncertainty the project has long faced. During the smelter’s ceremonial first shovelling — interrupted by Saving Iceland activists who rightly named it “Century’s Lack Of Permission Party” as the company did not have any permissions but to construct the building itself — Century’s director in Iceland, Ragnar Guðmundsson, said that he hoped the energy issues would be sorted in late 2010, when the smelter’s first phase would be complete.

Today the unfinished building stands like a skeleton at the construction site while the energy issue remains unsolved. Century has signed contracts with two energy companies, OR and HS Orka — the latter owned mostly by Canadian firm Alterra Power and partly by Icelandic pension funds — but neither company has been able to guarantee any energy. HS Orka hopes to be allowed to drill in the geothermal areas of the Reykjanes peninsula — a large-scale construction that would not only permanently alter the peninsula’s unique nature, but also, as many scientists have claimed, not produce enough energy for the Helguvík smelter.

OR, on the other hand, bets on Hverahlíð as an electricity supplier for Helguvík. But the company is heavily indebted after its recent aluminium adventures, which is one of the reasons the contract with Century should be breached, says Sóley Tómasdóttir from the Left Green party (“Vinstri græn”) and board member of OR. In an interview with RÚV in April this year, she maintained that the company should focus on the environmental impacts at Hellisheiði before even thinking about building new plants. She also criticised the current majority of Reykjavík’s city council (composed of the social democratic “Samfylkingin” and the centrist “Besti flokkurinn,” a new party that won the city elections in 2010), for not standing by its promises to stop selling new power from the publicly owned energy company to heavy industry projects.

In the same interview, Haraldur Flosi Ólafsson, chairman of the board, responded to this criticism by maintaining that despite the current majority’s official opposition to developing any further energy for aluminium production, the company would have to abide to already existing contracts. The Century contract is originally from 2006 but was renewed in late December 2008, less than three months after Iceland’s infamous economic collapse. At the aforementioned AGM, Haraldur’s words were echoed by the company’s director Bjarni Bjarnason, who said that in his opinion all future plans for building new power plants should be abandoned, as building new plants for private entities goes against the company’s current policy. However, Bjarni stated, already existing contracts needs to be abided.

Sóley disagrees, pointing out a clause in the contract, which should allow for the company’s withdrawal if it does not have the financial capacity to fund the project. But instead of doing so, OR is now planning to finance the Hverahlíð plant with the assistance of Icelandic pension funds. Such a step is generally seen as very controversial (such as in the heavily criticised case of HS Orka) and as the first step on the way to the privatisation of Iceland’s nature.

NEITHER SUSTAINABLE NOR RENEWABLE

The impacts of sulphur pollution, man made earthquakes and effluent lagoons appearing at Hellisheiði are of great importance in Iceland in view of the large scale geothermal plans which are increasingly being promoted in Mývatn and Reykjanes peninsula. According to the recently published parliamentary resolution for the so-called Master Plan for Hydro and Geothermal Energy Resources in Iceland, these geothermal power plans are definitely “on”, while several planned hydro dams are now “off”.

Effluent lagoons have already been discovered at test drilling sites at Þeistareykir and Bjarnarflag in the North9. If all of the planned geothermal power plants are built around Mývatn, the town of Reykahlíð will become exposed to 32,000 tons of hydrogen sulphide per year potentially raising serious health issues for residents10. In Reykjanes the two existing geothermal power plants at Svartsengi and Rekjanesvirkjun already produce huge amounts of hydrogen sulphide, and the proposed expansions and new projects would radically increase this figure. Scientists have warned that geothermal fields at Svartsengi are already overexploited and may not be able to produce power much longer11. In addition many of the new proposed drilling sites are connected to the same geothermal aquifer and could very quickly become dried or cooled by excessive exploitation for large scale energy. For further information read Saving Iceland’s detailed account of the planned geothermal power projects on Reykjanes peninsula.)

The fact is that geothermal energy technology is still very new and little is known about the long term, or even short term effects of exploiting the heat of volcanic aquifers on such a large scale. In addition, geothermal areas are globally incredibly rare and each one is different, making the impacts of drilling and power generation hard to predict. Cambridge University professor David McKay’s comprehensive 2009 book on sustainable energy points out that geothermal power is neither sustainable nor renewable when used on a commercial scale as the wells can quickly dry up or cool down, taking more than a hundred years to recover afterwards12, yet drastically altering the local environment. Experimenting with such an undeveloped technology in Iceland’s endemic geothermal hot spring areas, which the country is so famous for, could result in total destruction of these beautiful and unique places. All that for only a few years of energy production, which in turn would be sold at a cut rate price to heavy industry, reaping little reward for Icelandic people.

See Saving Iceland’s photos of the effects of drilling at Hellisheiði here. The photos are from 2008 when Saving Iceland’s then annual action camp against heavy industry was located at Hellisheiði. Read More

Aug 23 2012
3 Comments

Andrej Hunko: “Secret Police Networks Must Be Relentlessly Exposed”


“When police forces and intelligence services engage in international cooperation, parliamentary oversight is the loser. The increasing significance of undercover police networks is making this situation far more critical.” These comments were made by Bundestag Member Andrej Hunko in response to the Federal Government’s answer, which is now available in English (see below), to his Minor Interpellation.

The purpose of the interpellation, a written parliamentary question, was to heighten awareness of the following little-known police structures:

• the Cross-Border Surveillance Working Group (CSW), comprising mobile task forces on surveillance techniques, drawn from 12 EU Member States and Europol;
• Europol’s analysis work file entitled Dolphin, which entails the surveillance of left-wing activists in areas such as animal rights and anarchism;
• the Remote Forensic Software User Group, which was created by the Bundeskriminalamt, the German Federal Criminal Police Office, to promote sales of German Trojan software abroad.
• the European Cooperation Group on Undercover Activities (ECG), comprising spy chiefs from Member States of the EU and from countries such as Russia, Switzerland, Turkey and Ukraine;
• the International Working Group on Undercover Policing (IWG), comprising spy chiefs from European countries as well as from countries such as the United States, Israel, New Zealand and Australia;

Hunko went on to say:

“One of the main parts of the interpellation focused on the undercover activity of British police officer Mark Kennedy, whose infiltration of European leftist movements exemplifies police cooperation conducted beyond the bounds of parliamentary oversight. It remains unclear under whose orders the undercover investigator was operating during the years of his activity.

Kennedy used his infiltration of the Icelandic environmental movement to worm his way into leftist circles from Finland to Portugal through the information events he staged. The Icelandic police are stubbornly rejecting requests from the Minister of Justice to release full details of his activity into the public domain, claiming that disclosure would prejudice British security interests. Even though Members of the Icelandic Parliament have a right to ask questions on police matters, they are not being given any information. Read More

Jul 15 2012
3 Comments

Iceland Inside Fortress Europe? — Undercover Operations, Controlling Unwanted Migration and Policing the Cyberspace


Saving Iceland presents a talk by Matthias Monroy, journalist and political activist from Germany, in the Reykjavík Academia, Monday July 23 at 20:00.

The Mark Kennedy case illustrated how deeply Iceland is involved in European secret police networks that have been infiltrating environmentalist, anarchist and other leftist resistance movements since the late 1990s. The exposure of the undercover policeman also showed that it is near impossible to bring illegal practises of cross-border policing to courts: It is mostly unclear, which police authority in which country is responsible. In 2005 Kennedy infiltrated the Saving Iceland campaign, which resisted the dams at Kárahnjúkar in Iceland’s eastern highlands. He used his Icelandic connections and experience for a European-wide speaking tour to infiltrate activist groups in numerous countries.

Iceland is also involved in policing the EU migration regime, which will start the huge surveillance network EUROSUR in two years. This satellite surveillance involving usage of drones is complemented by the “Smart Border Package” facilitating border crossing by using biometric features and other technical tools. At the same time the EU changes the Schengen Border Codex, in which Iceland is also taking part. The agreement was one of the most important achievements for free travel within the EU. Now France and Germany constrain more border controls to block international protesters or exclude countries like Greece from the Schengen system. Iceland uses the measure, for example, to control the movements of motorcycle gangs.

To block unwanted migrants crossing the Evros river between Greece and Turkey, the EU is running a research program regarding the usage of land robots for border surveillance. The EU border agency FRONTEX, for which the Icelandic Coast Guard has worked in the Mediterranean, is now operating together with the Turkish government and is helping to install a police and customs centre at the common border with Bulgaria and Greece. For the first time, this structure includes the police agency EUROPOL, whose guidelines normally exclude the fight against migration.

To the contrary, the main pillar of EUROPOL becomes the control of so called “cybercrime” and “cyberterrorism”. The agency is running large databases, surveillance technology and digital forensic tools to support the police forces of the 27 member states in cross-border operations. EUROPOL is more and more controlling alleged “suspicious” behaviour on the internet, which leads to more need of safety for cyber activists as well as all citizens.

In his talk, Monroy will explain briefly the police networks built up by the European Union concerning undercover policing, the fight against unwanted migration and cyberspace. Monroy will also attempt to explain how Iceland is involved in or affected by current and future projects.

The talk will take place in the Reykjavík Academia, which also houses Iceland’s only anarchist library, on Monday July 23 at 20:00. The Academia is located at Hringbraut 121, 107 Reykjavík. The talk will be in English and entrance is free.

For more information write to savingiceland [at] riseup.net

Saving Iceland’s archive of articles regarding the Mark Kennedy case

Matthias Monroy, journalist and political activist

Jun 07 2012
3 Comments

Accused of Betrayal Because of His Opinions


On May 18, Icelandic newspaper DV published an interview with Janne Sigurðsson, director of Alcoa Fjarðaál since the beginning of this year. In the interview, Janne describes, amongst other things, crisis meetings that were held within the company due to the protests against the construction of the Kárahnjúkar dams and the aluminium smelter in Reyðarfjörður. With gross and incongruous sentimentality she compares the society in Eastern Iceland, during the time of the construction, with a dying grandmother, whose cure is fought against by the anti-Alcoa protesters. Janne also maintains — and is conveniently not asked to provide the factual backup — that only five people from the East were opposed to these constructions.

On May 21, however, DV published an interview with Þórhallur Þorsteinsson, one of the people from Eastern Iceland who had the courage to oppose the construction. In the interview, which turns Janne’s claims upside down, it emerges how heavy the oppression was in the East during the preamble and the building of the dams and smelter was — people where “oppressed into obedience” as Þórhallur phrases it. He talks about his experience, loss of friends, murder threats, the attempts of influential people to dispel him from his work, and the way the Icelandic police — and the national church — dealt with the protest camps organized by Saving Iceland, which lead him to wonder if he actually lived in a police state.

Þórhallur Þorsteinsson is one of the people from Eastern Iceland who protested against the construction of the Kárahnjúkar dams. For that sake, he was bandied about as an “environmentalist traitor”, accused of standing in the way of the progress of society. Influential people attempted to dispel him from his job, he had to answer for his opinions in front of his employers, and his friends turned against him. The preparations for the construction started in 1999, but the construction itself started in 2002. The power plant started operating in 2007 but the wounds have not healed though a few years have passed since the conflict reached its climax.

“There are certain homes here in Egilsstaðir that I do not enter due to the conflict. Before, I used to visit these homes once or twice a week. I am not sure if I would be welcome there today. Maybe. But in these homes I was, without grounds, hurt so badly that I have no reason to go there again. Now I greet these people but I have no reason to enter their homes. I was virtually persecuted,” Þórhallur says, sitting in an armchair in his home in Egilsstaðir.

His home bears strong signs for his love of nature, his bookshelves are filled with books about the Icelandic highlands, nature and animals. For decades, Þórhallur has travelled in the highlands and did thus know this area [the land destroyed by the Kárahnjúkar dams] better than most people. “I had been travelling in this area for decades. I had gone there hiking and driving and I have also flown over it. I went there in winters just as in the summers. I went there as a guide and I knew the area very well. So I am not one of those who just speak about this area but have never got to know it.”

Not only did he know the land but also cared for it. He was hurt to see it drowned by the reservoir and has never managed to accept its destruction. “I am immensely unhappy with everything regarding this project. The dams, the [Alcoa] aluminium smelter, the environmental impacts, and additionally, it has not brought us what was expected. Thus I find hardly anything positive about this,” Þórhallur says.

“The sacrifice of this part of the highlands, the environmental impacts of these constructions, just can not be justified. Waterfalls by the dozen, many of them extremely beautiful, are rapidly disappearing and are just about waterless. A highly remarkable land went under water, under the reservoir, for instance Hálsinn which was the main breeding ground for reindeer. Additionally, this was the only place in Iceland with continuous vegetation from the sea, all the way up to the glacier. This has now be interrupted by Hálslón [the reservoir].”

The Resistance in the East

During the journalist’s trip around Eastern Iceland, many of the locals spoke a lot about how artists from 101 Reykjavík [the center of the city] protested against the construction. Þórhallur, however, points out that the original resistance against the project was formed in the local region. “People tend to forget this fact all the time, as they only speak about 101 Reykjavík. Before the conflict started, an association for the protection of Eastern Iceland’s highlands was founded here. It was founded with the purpose of opposing the construction — Kárahnjúkar had not even entered public discussion at that point although we, of course, knew about it.”

About thirty people joined the inaugural meeting and agreed upon the importance of such an association. Soon, a few people left the organization. “Those who had an opposite opinion compared to what people generally thought about the project were oppressed. The picture was painted in a way suggesting that the residents of Eastern Iceland should stand together. The rest of us, who were against the project, were not considered true members of this society. And we were not good citizens at all. In people’s minds, we were traitors. We were the people who wanted to send people back to the turf huts, as they used to say. We were said to be against development, against creating a good future for our children. All this was thrown at us, that the children would not come back home after studying, that they would not get any jobs. By opposing the construction, I was, in these people’s minds, taking away their children’s future livelihood, preventing the creation of jobs, and lowering real estate prices here in the east. I got to hear all of this. This is how it was.”

The First Protests

At a certain point, the verbal abuse was taken further than can be considered normal. “My life was threatened. A man that I used to work with met me in the street and said that I ought to be shot. Of course, it was painful to live through this, it hurt because they were trying to oppress me. They personified the issue so they could portray me as if I was taking something away from people, as if I was preventing the people here from living an ordinary life. This was the attitude.

I have lived here since I was a little kid and from early age I have been contributing to this community. I have partaken in building it up, socially and as an individual. I have been here all my life. Despite my opposition to this construction, I did not consider myself being any less of a member of this community. Nothing of what I have done justifies the accusations of me wanting to ruin this community. I was simply against this construction. But just like others, I was to be suppressed into obedience.”

Despite all this, Þórhallur refused to throw away his ideals and stay silent. Determined not to be silenced, he continued his fight with both words and actions. “I am probably the only resident in Eastern Iceland who ever has been fined for opposing the Kárahnjúkar dams [in fact Gudmundur Mar Beck, farmer at Kollaleyra in Reydarfjordur (site of the ALCOA smelter) was also fined a hefty sum for protesting against the project. Ed. SI.org]. Along with others, I blockaded a bridge over river Besstastaðaá and was fined,” he says and adds that he did happily pay the fine. “This action was symbolic for the situation at that time, as a token of the fact that the case had become insolvable. We didn’t intend to completely prevent these people from continuing their way,” Þórhallur says. These people were the board of Landsvirkjun [Iceland’s national energy company] as well as Ingibjörg Sólrún Gísladóttir, then mayor of Reykjavík [later Minister for Foreign Affairs in the government that was toppled by protesters during the winter of 2008-9], and the area that was at stake at that time was Eyjabakkar wetlands. “We read two statements out loud, from the Association for the Protection of Eastern Iceland’s Highlands, and after that the protest was over.”

He does not regret this, even though he had to face the consequences his actions. “I was there in my spare time but at this time I worked for the The State Electric Power Works. Following the protest, we witnessed one of the worst witch-hunting periods in the history of Eastern Iceland. The severity is very memorable to me.”

Harsh Attacks

This protest had been organized by Þórhallur as well as Karen Egilsdóttir, who was an elementary school teacher, and Hrafnkell A. Jónsson, who has now passed away. “Parents phoned the school’s headmaster and demanded that their kids would not have to go to her classes. Politicians in the East systematically tried to get me fired from my job. They phoned both the State’s and the Region’s electric utility directors, demanding that I would be fired because of a thing I did in my spare time. These same men constantly interrupted the Chairman of RARIK [Iceland State Electricity] and I had to stand up for my opinions. I had to show up in front of the Region’s electric utility director and proof that I had been at the protest during my spare time. And as my words were not enough, I had to get my supervisor to come and proof it. Everything was tried. It was harsh.

And when I was informed that very influential people in the East, respected members of their society, were trying to get back at me and get me dispelled from work because of my opinions, I got a very strange feeling regarding what kind of a society I live in.

I also witnessed the behaviour of the police who chased protesters around the highlands, which made me wonder if I lived in a police state. The police tried to prevent protesters from resting by putting wailing sirens on during the middle of the nights, they constantly drove past them and around their cars, took photographs during darkness using flash, and blocked roads so that people could not bring them food. I saw all of this taking place.”

Always Knew of More Opponents

For two years in a row, the protesters set up camps in the highlands. During the first summer [2005], the protest camp was pitched on a land owned by the Bishop’s Office. “The church’s tolerance was not greater than so that the Bishop’s Office asked for the protesters to be removed. The second year I brought them food by taking an alternate route to their camp when the police had closed the main road. I supported these people because they were doing a job that many of us here, the locals, could not do. They were protesting against something that very few people from the East felt up to, due to the way those who dared to protest were treated. We were monitored and the word, about what kind of a people we were, was spread around. That is the reason why many people contacted me, people who otherwise did not dare to voice their opinion, did not dare to join the struggle. I always knew that I spoke on behalf of more people than just myself.”

Thus, when Saving Iceland contacted Þórhallur, he was more than willing to help. He was a spokesperson of the Icelandic Touring Association and explained to Saving Iceland that it would be just about impossible to expel them from the camping area at Snæfell, which had been open to the public for many decades. Eventually, a ten days long camp was to be set up there. “Then the word started to spread and I received a phone call from the Bishop’s Office, asking me if we could stop the camp from taking place. I told them that this camping area had been open to the public ever since the hut was built, but I invited them to come to the East and try to expel them themselves. A few days later, Landsvirkjun’s public relation manager called me and brought up the same thing. He asked about the possibility of putting a limit on the amount of people allowed to stay at the camp, if the health and safety authorities would agree upon this amount of people, etc. etc. I told him the same: “This is an open camping area and we do not choose who gets to stay and who not.” You get the picture of how the situation was at this time.”

Not everybody was happy within the Touring Association. “Some of the board members were against it and conflicts took place within the association. I asked them what they intended to do, if the Association would then, in the future, pick out people allowed onto the camping areas. I said to them: These people just enter the camping area, follow the current rules and pay their fee. While so, we can not do anything. Then, some of the people realized how far they had stepped over limits.

So the protesters came to Snæfell and stayed for ten days. That worked out pretty well but then they went to other places [within the intended reservoir. Ed. SI] and came up against all sorts of misfortunes.”

A Protection Cancelled

He also points out how politicians behaved in the Kárahnjúkar issue. “It is interesting to look at the current discussion about the Energy Master Plan. Some people now say that politicians are interfering with specialists’ work. In that case, it is worth remembering the fact that the Kárahnjúkar dams were removed from the Master Plan and were only briefly considered in that context. Those who decided this were politicians. The project underwent an Environmental Impact Assessment and Iceland’s Planning Agency rejected it due to the drastic and irreversible environmental impacts. But then the case was simply taken into a political process and soon it was decided to go ahead and build the dams, despite the Planning Agency’s view that the environmental impacts were unacceptable.

The way this case was handled should actually be an ample reason for an investigation. This area’s official protection was cancelled so the land could be drowned. Never before had this happened in Iceland, but it was nevertheless done by Siv Fiðleifsdóttir, then Minister of the Environment. That is her monument: being the one Minister of the Environment, responsible for the most severe environmental destruction,” Þórhallur says plain-spoken.

The Old People Got Away

He believes that only the further damming of Þjórsárver wetlands would have been a even bigger environmental sacrifice. “Thereafter came Kárahnjúkar. But this is all about politics, Icelanders have no time for politics. The Danes have done fine without heavy industry. This is always just a question of a political policy, and for decades, the inhabitants of Reyðarfjörður [where the Alcoa smelter is located] have been promised that someone will come and do something for them. In such a position, people tend to forget their survival instinct.

The exchange rate was way too high and all the local fishing industry left. Fishing company Skinney Þinganes moved all their business to Höfn in Hornafjörður, while Samherji [another seafood company incidentally owned by the family of Halldor Asgrimsson, one of two main perpetrators of the Karahnjukar dams] bought fishing quota from Stöðvarfjörður and Eskifjörður and took it away from there. But because an aluminium smelter was on its way, people believed that this was no problem. It is always possible to starve people into obedience. It is easy to change the mentality in such a way that it simply receives. All of a sudden the smelter appeared as some sort of a life buoy. The positive side of it is that now there are much younger people living in Fjarðabyggð [combined municipality of a few towns, including Reyðafjörður] than before. The old people got away. But behind this is the sacrifice. The sacrifice was too big and it was the whole region’s sacrifice. We sacrificed this for the benefits of a North American corporation. We sacrificed everything for too little. While all this took place, people were supposed to stand together and they spoke about the region as a totality. But immediately as the construction was over, all such solidarity disappeared.”

Direct and Indirect Payments

He is, nevertheless, able to understand why the region’s people were in favour of the construction and focused on getting a smelter. “I understand them very well, as they got something out of it. But it is clear that we got too little. 200 people from here work in the smelter, I think. 200 jobs — that is not enough for such a sacrifice. 500 jobs would also not have been enough when compared with the land that was destroyed. But people can be bought up if they are handed money. And I understand farmers who had never seen any real money but were all of sudden promised amounts which they would, in any other case, not have been able to even dream of. But is that the way we want it to be? That people can be mislead by money?

If they would have stood their ground and rejected all of , if the Fljótsdalshérað region would have rejected this, and the local politicians and the public — then this would never have become true. Now, some people state that we never had anything to say about it, but these are people who have a bad conscience because they did not fight against the construction.

Everywhere in the world, except Iceland, these “counterbalance steps” as they are called, would have been considered bribery. Basically, local politicians were bought up. Farmers and influential people were hired on good salaries and farmers got fertilizer to use on uncultivated land. All such indirect payments to influential people certainly have an impact on what decisions are made and on what premises they are made. Some farmers received compensation due to the destruction, but to pay compensation to only one generation is not acceptable. It would have made much more sense to link the compensation with the power plant’s electricity production and pay them to those living in the area on an annual basis.”

Gullfoss Falls Could be Forgotten

Asked about the actual value of the land now lost, Þórhallur answers: “This land used to be an attraction. The waterfalls that have now dried up, the vegetated land that went under water, the wilderness which is becoming increasingly precious. Being able to live with such quality is like nothing else. If well organized, hundreds of thousands of travellers could have been been shown this land without the land being harmed. Seen from a long-term perspective, that could have created more money than the dams.”

Think about the fact that the Gullfoss waterfalls and the hot spring Geysir did not use to be popular tourist places. It was not easy to get to them, say fifty or hundred years ago. We can not sacrifice something just because only a few people know about it. Using that same argument, we could as well dry up Gullfoss, as in a few decades we would forget about it and the next generations would not know what a beautiful waterfall used to flow there. We can not think in that way. One generation can not treat Iceland’s nature, this national treasure, in such a way.

I first drove to Hafrahvammar canyon in 1972 and, in fact, roads and paths have been there for many decades, but they were quite difficult to pass. That could easily have been changed and thus, the access to the area could have been increased.”

“The Same Horrific Situation Far and Wide”

In the end he says that the aluminium smelter has not lived up to society’s expectations. “It still has not been possible to staff the smelter with Icelanders. Only Icelandic-speaking people are hired there but despite all the unemployment and all the advertising, sub-contractors partly staff their companies with foreigners, as Icelanders are not willing to take on these jobs. The labour turnover has been about 25 percent. Despite the fiasco the nation has went through [the 2008 economic collapse], this is not considered a decent option for a working place.

Was the hole purpose of drowning this land, destroying this nature, drying up these waterfalls, to be able to import migratory workers from abroad? Do some of the unemployed people on Suðurnes not want to come to the East, move into all the empty apartments and work in the smelter in Reyðarfjörður? Isn’t there something wrong? Why do people not apply for jobs here?” Þórhallur asks and adds that the pot-rooms and the cast-house are not really desirable workplaces, though some other jobs in the smelter might lure some. “One has to work 12 hours shifts and I know no-one who works in the smelter and looks at it as their future job. I also know people who used to work there but quit because of the long shifts. They did not want to sacrifice their family life for the job. People will work there until they find a better job. If the economy recovers in a few years time, how will this end? Will we end up having to staff the smelter solely with foreign labour on season?

This was supposed to save everything but the same horrific situation is evident far and wide. The smelter had, for instance, no positive impacts in nearby places like Stöðvarfjörður and Breiðdalsvík.

The planned population increase in Eastern Iceland never took place, and as the senselessness was absolute, everything collapsed. No-one lives in the houses that were built — streets were laid but no houses built on them. The municipality is bankrupted, as it is expensive to go into such a construction and to sit up with this half-finished street-system. This situation might recover in a few decades, but it still was not worth it.”

May 30 2012
2 Comments

The Unmasking of the Geothermal Green Myth Continues, and Other News


Recent studies show links between asthma and sulphur pollution from geothermal power plants. Reykjavík Energy denies their connection with newly discovered effluent water lagoons in Hellsheiði. The Parliament’s Industries Committee orders a report that condemns preservation of nature, presented in a parliamentary resolution for Iceland’s Energy Master Plans. Alterra Power announces lower revenues in Iceland and their plans to enlarge the Reykjanesvirkjun geothermal power plant despite fears of over-exploitation. Greenland faces Alcoa’s plans of an import of cheap Chinese labour en masse, while Cairn Energy dumps toxic materials into the ocean off the country’s shores.

This is the content of Saving Iceland’s first round of brief monthly news from the struggle over Iceland’s wilderness and connected struggles around the world.

Hellisheiði: Asthma, Sulphur Pollution and Effluent Water Lagoon

Those who promote large-scale geothermal energy production as green and environmentally friendly, are once again forced to face another backlash as a recent research suggests a direct link between sulphur pollution from the Hellisheiði geothermal plant and asthma among the inhabitants of Reykjavík. The results of this particular research, which was done by Hanne Krage Carlsen, doctorate student of Public Health at the University of Iceland, were published in the Environmental Research journal earlier this year, showing that the purchasing of asthma medicine increases between 5 and 10 percent in accordance with higher sulphur pollution numbers in the capital area of Reykjavík.

Adding to the continuous unmasking of the geothermal green myth, environmentalist Ómar Ragnarsson recently discovered and documented new lagoons, created by run-off water from Reykjavík Energy’s geothermal power plant in Hellisheiði. At first Reykjavík Energy denied that the lagoons’ water comes from the company’s power plant, but were forced to withdraw those words only a few days later. Ómar had then brought a journalist from RÚV, the National Broadcasting Service, to the lagoons and traced the water to the plant. Despite the company’s withdrawal, they nevertheless rejected worries voiced by environmentalists, regarding the very possible pollution of ground water in the area, and insisted that this is allowed for in the plant’s license.

According to the plant’s license the run-off water should actually be pumped back, down into earth, in order to prevent polluting impacts and the creation of lagoons containing a huge amount of polluting materials. Ómar’s discovery shows that this is certainly not the case all the time, and additionally, the pumping that has taken place so far has proved to be problematic, creating a series of man-made earthquakes in the area, causing serious disturbances in the neighbouring town of Hveragerði.

In an article following his discovery Ómar points out that for the last years, the general public has not had much knowledge about geothermal power plants’ run-off water, and much less considered it as a potential problem. Ómar blames this partly on the Icelandic media, which have been far from enthusiastic about reporting the inconvenient truth regarding geothermal power production. One of these facts is that the effluent water, which people tend to view positively due to the tourist attraction that has been made of it at the Blue Lagoon, is a token of a serious energy waste, as the current plants use only 13% of the energy while 87% goes into the air or into underutilized run off-water. These enlarging lagoons — not only evident in Hellisheiði but also by the geothermal power plants in Reykjanes, Svartsengi, Nesjavellir and Bjarnarflag — suggest that the energy companies’ promises regarding the pumping of run-off water, are far from easily kept.

The Fight Over Iceland’s Energy Master Plan Continues

During the last few weeks, the Icelandic Parliament’s Industries Committee received 333 remarks in connection with the committee’s work on a parliamentary resolution for Iceland’s Energy Master Plan. The resolution, which was presented by the Ministers of Industry and of Environment in April this year, gives a green light for a monstrous plan to turn the Reykjanes peninsula’s geothermal areas into a continuous industrial zone.

The remarks can generally be split into two groups based on senders and views: Firstly, individuals and environmentalist associations who, above all, protest the afore-mentioned Reykjanes plans. Secondly, companies and institutions with vested interests in the further heavy industrialization of Iceland who demand that the Master Plan’s second phase goes unaltered through parliament — that is, as it was before the parliamentary resolution was presented, in which the much-debated Þjórsá dams and other hydro power plants were still included in the exploitation category. Saving Iceland has published one of the remarks, written by Helga Katrín Tryggvadóttir, which differs from these two groups as it evaluates energy production and nature conservation in a larger, long-term context.

During the process, the head of the Industries Committee, Kristján Möller — MP for the social-democratic People’s Alliance, known for his stand in favour of heavy industry — ordered and paid for a remark sent by management company GAMMA. The company first entered discussion about one year ago after publishing a report, which promised that the national energy company Landsvirkjun could become the equivalent of the Norwegian Oil Fund, if the company would only be permitted to build dams like there is no tomorrow.

In a similarly gold-filled rhetoric, GAMMA’s remark regarding the Energy Master Plan states that the changes made by the two ministers — which in fact are the results of another public reviewing process last year — will cost Iceland’s society about 270 billion ISK and 5 thousand jobs. According to the company’s report, these amount are the would-be benefits of forcefully continuing the heavy industrialization of Iceland, a plan that has proved to be not only ecologically but also economically disastrous. Seen from that perspective, it does not come as a surprise realizing that the management company is largely staffed with economists who before the economic collapse of 2008 lead the disastrous adventures of Kaupþing, one of the three biggest Icelandic bubble banks.

Alterra Power: Decreases Revenue, Enlargement Plans in Iceland

Canadian energy company Alterra Power, the majority stakeholder of Icelandic energy company HS Orka, recently published the financial and operating results for the first quarter of this year. “Consolidated revenue for the current quarter was $16.4 million compared to $18.9 million in the comparative quarter,” the report states, “due to lower revenue from our Icelandic operations as a result of lower aluminium prices, which declined 13.9% versus the comparative quarter.”

At the same time, the company’s Executive Chairman Ross Beaty stated that Alterra is preparing for an enlargement of the Reykjanesvirkjun geothermal power plant, located at the south-west tip of the Reykjanes peninsula, which should increase the plant’s production capacity from the current 100 MW to 180 MW. The construction is supposed to start at the end of this year and to be financed with the 38 million USD purchase of new shares in HS Orka by Jarðvarmi, a company owned by fourteen Icelandic pension funds.

According to Alterra, permission for all construction-related activities is in place. However, as Saving Iceland has reported, Iceland’s National Energy Authority has officially stated their fears that increased energy production will lead to an over-exploitation of the plant’s geothermal reservoir. Furthermore, Ásgeir Margeirsson, Chairman of HS Orka, responded to Alterra’s claims stating that due to a conflict between the energy company and aluminium producer Norðurál, the construction might not start this year. According to existing contracts, the energy from the enlargement is supposed to power Norðurál’s planned aluminium smelter in Helguvík. That project, however, has been on hold for years due to financial and energy crisis, and seems to be nothing but a fantasy never to be realised.

Greenland: Cheap Chinese Labour and Toxic Dumping

The home rule government of Greenland is split in their stand on Alcoa’s plans to import 2 thousand Chinese workers for the construction of the company’s planned smelter in Maniitsoq. The biggest governing party, Inuit Ataqatigiit, is against the plan as the workers will not be paid the same amount as Greenlandic labour. On the other hand, the Democratic Party, which has two of the government’s nine ministerial seats, is in favour of the plans on the grounds that the workers’ working condition and payments will be better than in China.

In Iceland, during the construction of the Kárahnjúkar dams and Alcoa’s aluminium smelter in Reyðarfjörður, Chinese and Portuguese migrant workers were imported on a mass scale. More than 1700 work-related injuries were reported during the building of the dams, ten workers ended up with irrecoverable injuries and five workers died. In 2010, the Occupational Safety and Health Authority stated that the Kárahnjúkar project was in a different league to any other project in Iceland, with regard to work-related accidents.

At the same time as Greenland’s government argued over Alcoa, Danish newspaper Politiken reported that the Scottish oil company Cairn Energy — a company that, along with Indian mining giant Vedanta, shares the ownership of oil and gas company Cairn India — is responsible for dumping 160 tons of toxic materials into the ocean in the years of 2010 and 2011. The dumping is linked to the company’s search for oil off Greenland’s shore and is five times higher than the amount of comparable materials dumped in 2009 by every single oil platform of Denmark and Norway combined.

May 26 2012
1 Comment

Renewable Resources, Unsustainable Utilization


In April this year, Iceland’s Ministers of the Environment and of Industry presented a parliamentary resolution for Iceland’s Energy Master Plan, in which the controversial plans to dam river Þjórsá are put on hold while the unique geothermal areas of the Reykjanes Peninsula are set for a monstrous exploitation — one that will turn the peninsula into a continuous industrial zone. For the last weeks, the resolution has been in the hands of the Industries Committee of Iceland’s parliament — a process that included more than 300 letters of remarks, sent in by individuals, associations, institutions and corporations.

The remarks can generally be split into two groups based on senders and views: firstly, individuals and environmentalist associations who above all protest the afore-mentioned plans for the Reykjanes peninsula; secondly, companies and institutions with vested interests in the further heavy industrialization of Iceland who demand that the Master Plan’s second phase goes unaltered through parliament — that is, as it was before the parliamentary resolution was presented, in which the planned Þjórsá dams and other hydro power plants are included in the exploitation category.

One of the remarks sent in differs from the others as it evaluates energy production and nature conservation in a larger, long-term context. That remark, written by Helga Katrín Tryggvadóttir, MA in development studies, is published here below, translated from Icelandic by Saving Iceland.

I find myself inclined to make a few remarks regarding the Industries Committee’s discussion about the Energy Master Plan. My remarks do not concern particular natural areas but rather the comprehensive ideas regarding the scope and nature of the protection and exploitation of natural areas. Since the making of the Energy Master Plan begun, much has changed for the better as researches and knowledge on energy production and nature conservation continuously advance. The social pattern as well as opinions on nature conservation have also changed rapidly since the first draft for an Energy Master Plan was published, and the emphasis on nature conservation constantly increases. With this in mind it is necessary to take into account that during the next years, this emphasis on nature conservation is likely to increase even further. Therefore it is important for the Industries Committee to remember that keeping natural areas in pending does not prevent future utilization, whereas areas exploited today cannot be protected tomorrow.

Unsustainable Utilization

The many negative impacts of geothermal and hydro power plants have not been discussed thoroughly enough in Iceland. This can probably be explained by the the fact that these are renewable energy sources and thereby, people tend to view them as positive options for energy production. Thus we often hear that it is better to operate energy intensive industries here, using renewable energy sources, rather than in countries where the same industries are powered by electricity produced by coals and oil. However, when these issues are looked at it more accurately, we have to be aware of the fact that despite hydro and geothermal power’s renewability, their current utilization in Iceland is by no means sustainable.

Using the hydraulic head of glacial rivers, hydro power plants require reservoirs which deplete vegetated land, the reservoirs get filled with mud and by time the area becomes an eroded land. When it comes to geothermal areas, exploited for energy production, the seizure of fluid is much greater than the inflow into the geothermal reservoir and therefore the geothermal power dries up by time. At that point the area has to rest for a time still unknown in the geothermal sciences. Thus it is clear that although we are dealing with renewable energy sources, they do not at all allow for infinite energy production, and additionally the power plants themselves entail environmental destruction. It is clear that the utilization of these resources has to be executed very carefully, and preferably, all further utilization plans should be put on hold until it is possible to learn from the experience of the plants built in the very recent past.

CO2 Emission

A lot of emphasis has been put on the idea that Iceland possesses huge amounts of “green energy,” meaning that this energy does not burn fossil fuels. Thereby it is assumed that no CO2 emission takes place. This is, however, far from the truth: in 2008 the CO2 emission from geothermal plants in Iceland amounted to 185 thousand tons, which is 6% of the country’s total CO2 emission1. Hydro dams also add to the amount of carbon in the atmosphere: big reservoirs cause the drowning of vegetated land, wherein rotting vegetation emits methane gas, increasing global warming. It is estimated that about 7% of carbon emitted by humans come from such constructions2. The sediment of glacial rivers affects the ocean’s ecosystems and nourishes algae vegetation by the seashore. Marine organisms play an important part in extracting carbon from the atmosphere; it is estimated that such vegetation extracts about 15 times more of CO2 than a woodland of the same size3. Annually, the ocean is believed to extract 11 billion tons of CO2 emitted by men4. By damming glacial rivers, entailing disturbance of their sediment and of algae vegetation, Icelanders are not only threatening the fish stocks around the country, and thus the country’s fishing industry, but also further contributing to global warming in a way which is more dangerous than deforestation, though the latter has undergone much harsher criticism worldwide than the destruction of oceanic ecosystems.

Geothermal Power Plants

In the Energy Master Plan’s second phase, possible geothermal power plants are listed in 20 out of the 25 highest seats of exploitation. If the planned hydro dams, Hvamms- and Holtavirkjun, in river Þjórsá will be kept in pending — which I rejoice as a resident of the Skeiða- og Gnúpverjahreppur region — geothermal power plants will occupy 22 out of the 25 seats. Due to the fact that so little is known about the long-term impacts of geothermal power plants, this ordering is a matter of concern. Before further construction takes place, it is necessary to wait until more experience is gained from the already operating geothermal power plants. Many of the problems connected to these plants are still unsolved, for instance the dangerous material in the plants’ run-of water as well as their polluting emissions. This has to be taken into consideration, especially near the capital area of Reykjavík where sulphur pollution is already very high5.

It also has to be taken into account that geothermal energy production is not sustainable, as an geothermal area’s heat supply eventually dries up. Their usage allows for 50 years of production, which of course is a very limited amount of time. If the plan is to use such energy for industrial development it has to be kept in mind that 50 years pass very quickly, meaning that the jobs at stake are no long-term jobs. At the same time, such a short-term utilization encroaches on future generations’ right to utilize the geothermal energy sources, not to mention their right to utilize these areas by protecting them for outdoor activities and creation of knowledge, as Iceland’s geothermal areas are unique on a global scale. For the last weeks, we have witnessed how the already exploited geothermal areas, or those where test-drilling has taken place, have not at all been utilized in a way that goes together with tourism and outdoor activities, as the areas’ appearance and environment have been damaged on a large scale6.

Economical Arguments

When it comes to economical arguments, people often tend to call for short-term employment solutions, stating that it is important to construct as many possible power plants in the shortest time in order to create as many jobs as possible. The fact, however, is that a construction-driven economy will always lead to instability, and such instability is indeed the Icelandic economy’s largest bale. Above all, Iceland’s economy needs stability and a future vision that sees further than 10 years into the future. For a stable future economy to be built, it has to happen in a sustainable way, whereas continuous aggressive exploitation of the country’s natural resources will simply lead to an era of regular economic collapses. By putting such strong emphasis on the aggressive exploitation of hydro and geothermal resources, with the appendant construction bubbles, a situation of unemployment will be sustained, broken up by occasional and differently short-lived boom periods in between. Read More

May 21 2012
1 Comment

Glencore: Reaping Huge Profits From Life’s Essentials


This video by Patrick Clair tells the story of commodity broker Glencore International, the biggest shareholder of Century Aluminum, and the company’s dangerously powerful position on the world’s markets.

Click here to read Saving Iceland’s dossier on Glencore, Century and the incestuous world of mining.

May 11 2012

The Geothermal Ecocide of Reykjanes Peninsula


After thirteen years of environmental, economic and technical evaluations, followed by a proposition for a parliamentary solution and a three month long public comments process, wherein 225 reviews where handed in — we are now witnessing the final steps in the making of Iceland’s Master Plan for Hydro and Geothermal Energy Resources. The plan, which in diplomatic language is supposed to “lay the foundation for a long-term agreement upon the exploitation and protection of Iceland’s natural resources,” has now been presented as a bill by the Ministers of Environment and of Industry, respectively, and is currently awaiting discussion and further bureaucratic processes in parliament.

Treated as the Master Plan’s trash can, the unique geothermal areas on the Reykjanes peninsula get a particularly harsh deal. Out of the peninsula’s nineteen energy potential areas, only three are listed for protection while seven are set for exploitation in addition to the four that have already been harnessed. Five additional areas are kept pending, more likely than not to be set for exploitation later. Existing plans for energy production outline how the peninsula is set to be turned into a single and continuous industrial zone, and the power companies seem to be simply waiting for a further green light to exploit the area. All this in order to further feed the aluminium industry.

In this overview we take a look at nine of these nineteen areas — those from the west of Gráuhnúkar — of which only one is to be protected according to the Master Plan. We look at the plans on the drawing board, their current status, the key companies involved, the already existing power plants, the threatened areas, and at last but not least: possible targets for direct action. On the map below, these areas are marked from number one to nine. Obviously the map only shows the areas at stake and the reader has to use her or his imagination to fill in power lines and the rest of the necessary infrastructure. Most of the following photos are taken by Ellert Grétarsson — click here and here for more of his photos.

Energy Options

 

Unmasking the Geothermal Myth

In a world increasingly concerned about carbon emissions,” Jaap Krater and Miriam Rose state, “the clean image of hydroelectric and geothermal energy is appealing.” This has certainly been the case in Iceland, where the highly polluting aluminium industry has attempted to re-model their dirty image by powering their production with so-called ‘green energy’. However, this greenwashing has not entirely worked as the eastern highland’s Kárahnjúkar dams — fully built in 2007 to power an Alcoa aluminium smelter in Reyðarfjörður — have proven to be as ecologically and economically disastrous as environmentalists warned. As a result the aluminium companies have now mostly moved from hydro and instead are increasingly focussing on geothermal energy.

One of the companies is Norðurál, subsidiary of Century Aluminum, who claim that their planned 360 thousand ton aluminium smelter in Helguvík will be one the world’s most environmentally friendly smelters. Why so? Because according to the company, the 625 MW of electricity required to run a smelter of this size is supposed to come only from the peninsula’s geothermal energy sources. However, environmentalists and scientists consider the estimation of geothermal energy believed to be extractable from the peninsula to be highly over-estimated, and claim that additional hydro power plants would be needed to power the smelter. This would most likely come from the much-debated and now temporarily halted dams in the river of lower Þjórsá.

Last year, unable to access the necessary geothermal energy in north Iceland, aluminium company Alcoa was forced to withdraw their six years long plan to build a geothermal powered smelter at Bakki, Húsavík. We predict that if Century cannot force through the damming of lower Þjórsá a similar situation awaits Helguvík. But that has not stopped the project’s interested parties, who still state confidently that the smelter will be built, and powered with geothermal energy.

Regardless of the need for additional hydro power, the exploitation of the Reykjanes peninsula’s geothermal areas spells the end of this magnificent nature of the peninsula as we know it. Test drilling and boreholes, endless roads and power lines, power plants and other infrastructure; all this would turn the Reykjanes peninsula — this unique land of natural volcanic wonders, which many scientists and environmentalists believe to be one of the world’s best options for creating a giant volcano park with educational and tourism-related opportunities — into a large industrial zone.

But these are only the very visible impacts of the planned large-scale exploitation. Other environmental catastrophes are in fact inevitable with large scale geothermal industry, becoming increasingly visible to the public as the green reputation of geothermal energy slowly decreases.

Two of Saving Iceland’s spokespersons — ecological economist Jaap Krater and geologist Miriam Rose — have thoroughly analysed the development of Iceland’s geothermal potential in a chapter, written on behalf of Saving Iceland, and recently published in a book on the current energy crisis. While we strongly recommend the piece for further reading about the geothermal myths, a few of their points will be addressed here, with relevance to recent events in Iceland.

Firstly, geothermal gases are rich in a variety of harmful elements and chemical compounds such as sulphur dioxide, whose impacts are systematically underestimated according the Public Health Authority of Reykjavík. Since production began at the Hellisheiði geothermal power plant — often claimed to be the biggest of its kind in the world — in 2006, a 140 percent increase of sulphur pollution has been measured in the capital area of Reykjavík, only 30 kilometres away. Recent studies, conducted by the University of Iceland, suggest a direct link between increased sulphur pollution on the one hand, and increased use of medicine for asthma and heart disease ‘angina pectoris’ on the other hand. However, engineering firms such as Mannvit, authors of many of the Environmental Impacts Assessments for geothermal power-plants, have so far ignored these studies and instead based their assessments on so-called prediction models. (Read more about the sulphur pollution here and here.)

Secondly, at the end of last year it was revealed that for two years energy company Reykjavík Energy — who own and operate the Hellisheiði plant — had on occasions been pumping waste water containing hydrogen sulphide into drinking water aquifers. Sulphides are far from being the plants’ only damaging effluents entering our water system; Krater and Rose mention that “geothermal fluids contain high concentrations of heavy metals and other toxic elements, including radon, arsenic, mercury, ammonia, and boron.”

Thirdly, it is suggested that depletion of one geothermal reservoir can result in the drying up of surrounding hot spring areas. While large-scale exploitation in Iceland is probably too young to witness these effects, environmentalists and geologists have warned that exactly this will happen in the Reykjanes peninsula if the existing plans go ahead.

The Key Companies Involved

HS Orka

HS Orka is an energy company that owns and operates two geothermal power plants on the peninsula — Reykjanesvirkjun and Svartsengi — the majority of who’s energy goes to Norðurál’s aluminium smelter in Grundartangi, Hvalfjörður. HS Orka’s majority shareholder is Magma Energy Sweden A.B., a puppet company of the Canadian firm Magma Energy, which was established to get around laws that prevent non-Europeans from buying Icelandic companies. After Magma’s 66,6% share, the remaining 33,4% is owned by Icelandic pension funds.

Before privatisation HS Orka (then called Hitaveita Suðurnesja) was owned fifty-fifty by the Icelandic state and several municipalities on the country’s south-west coast, but in 2007 the state’s share was sold to a private company named Geysir Green Energy (GGE). Following laws passed in 2008, regarding the separation of private energy production from competitive operations, the company became two different firms — HS Veitur and HS Orka — of which the latter takes care of energy production and sales. Bit by bit, GGE bought up two thirds of HS Orka’s shares. In 2009, GGE sold extra 10% to Magma Energy, which at the same time bought 32% from another energy company, Reykjavík Energy, and the nearby municipality of Hafnarfjörður. At this point GGE owned 55% of HS Orka and Magma owned 43%.

Harsh criticism arose over these deals which were effectively privatisation of Iceland’s natural resources, including a campaign led by pop-singer Björk and Eva Joly, the recent French Green Party presidential candidate, who at that point served as the Icelandic center-left government’s special financial advisor, following the general elections in 2009. Asked if the company was considering majority stake in HS Orka, Magma’s CEO Ross Beaty replied with a straight “no”. He then emphasised that the company would not buy more than 50% of the shares, as had officially been accepted by Iceland’s government, calling this “a rather awkward business position but certainly something that we feel can be workable.”

However, in 2010 Geysir Green Energy sold all their shares to Magma, which now owned 98.5% of HS Orka. A year later Magma sold 25% to Jarðvarmi slhf, a company owned by fourteen Icelandic pension funds, which a little later bought additional 8.4%. At last, Magma bought the 1.5% still owned by four different municipalities. Thus Magma holds 66.6% of the shares today, while Jarðvarmi owns 33.4%. The land use rights held by Magma allow for 65 years exploitation with an option to extend this for another 65 years.

Alterra Power

Just as the name could not have been coloured with more controversy and scepticism, Magma Energy merged with Plutonic Power and became Alterra Power, a company traded on the Toronto Stock Exchange. The new company’s Executive Chairman Ross Beaty, said that the merger would “strengthen both companies and […] create a larger, more diversified renewable energy company.” He further stated: “Geothermal will remain a core focus of the new company, but hydro, wind and solar assets will be solid business platforms for future growth. In the renewable energy business, bigger is better and this combination will achieve that while enhancing returns to each company’s shareholders.”

Alterra Power already operates geothermal, hydro and wind power plants in Nevada and British Columbia, which together with the Iceland plants have the energy capacity of 570 MW. In the company’s own words, they have a “strong financial capacity to support [their] aggressive growth plans,” which include geothermal plants in Chile and Peru. Such Latin-American adventures are certainly not new to the company’s key people, as Ross Beaty founded and currently serves as Chairman of one of the world’s largest silver producers, Pan American Silver, with some of its mines in Peru.

For the last three decades in fact Beaty has founded and divested a series of mineral resource companies, but has now shifted his focus to the ever-enlarging economy of ‘green energy’. As he explained himself: “This time around I wanted to build something green, so I looked at geothermal and it was just perfect, it just fit”. When confronted with the possibility that he and his company were taking advantage of Iceland’s economic collapse — a theory supported by the words of John Perkins, the author of ‘Confessions of an Economic Hitman’ — he called such ideas “ignorance and complete nonsense.” Only a few months later, he nevertheless said to Hera Research Monthly, an online investment newsletter, that “going into Iceland was strictly something that could only have happened because Iceland had a calamitous financial meltdown in 2008.”

Norðurál

Norðurál is a subsidiary of North-American aluminium producer Century Aluminum, whose largest shareholder is commodity broker Glencore International, a company that controls almost 40% of the global aluminium market. Glencore is mostly known for its many tentacles of corruption and worldwide human rights and environmental violations — most recently manifested in the exposure of child-labour in the company’s copper mines in the Democratic Republic of Congo, as well as the dumping of acid into a river at another site in the same country.

Norðurál currently operates an aluminium smelter in Hvalfjörður, which was fully built in 1998 despite harsh opposition by the fjord’s inhabitants. The smelter has been enlarged in a few phases, seeing the production capacity going from the original 60 thousand tons per year, to the current 278 thousand tons. Since 2004, the company has invested 20 billion ISK into building another Iceland smelter, in Helguvík on the north-west tip of the Reykjanes peninsula. According to the project’s Environmental Impact Assessment (EIA), the smelter is supposed to be powered solely by the peninsula’s geothermal energy — a claim that environmentalists and geologists have seriously questioned.

In April 2007, HS Orka signed a contract with Norðurál, promising the latter company 150 MW of energy for the Helguvík smelter’s first phase, supposed to be extracted by the planned expansion of the Reykjanesvirkjun geothermal power plant. Three years later, when no energy had been made available, the aluminium company filed charges against HS Orka for non-compliance. The conflict ended up in an arbitration court in Sweden, the registered home country of HS Orka’s owner, Magma Energy Sweden. Officially the conflict was presented to the public as a matter of energy prices but in late 2011 the court ruled that HS Orka is obliged to provide Norðurál the originally agreed-upon energy, suggesting that the conflict had to do with more than prices.

Already Existing Power Plants

Reykjanes

Reykjanesvirkjun is a 100 MW plant, owned by Alterra Power, whose energy partly powers Norðurál’s smelter in Hvalfjörður. It is located on 410 hectares of land located at the south-west tip of the peninsula. The company has plans for at least an 80 MW expansion of the plant, which is supposed to take place in two 50 and 30 MW phases, that according to HS Orka should both be completed in 2013.

However, following conditions set by Iceland’s National Energy Authority (NEA) last year, the expansion plans have become a bit more complicated. In order for it to happen, at least 30 out of the 50 MW included in the first phase have to come from another area than currently planned. Further extraction in the already exploited area would simply be unsustainable and decrease the area’s capacity. Geologist Sigmundur Einarsson actually believes that the field is already over-exploited. His claim is based on studies from 2009, by the very same NEA, which state that the area’s long-term sustainable production capacity is hardly more than 25 MW.

Svartsengi

The Svartsengi plant is operated by HS Orka and is located on 150 hectares of land owned partly by the municipality of Grindavík and partly privately. Next to it stands the Blue Lagoon, a tourist attraction created by the brine pollution from the power plant. The plant is a combined electricity and heat plant with a current electric power capacity of 75 MW, of which most goes to Norðurál’s smelter in Hvalfjörður.

The Threatened Areas

Eldvörp

The Master Plan gives a green light for the exploitation of Eldvörp, a 15 km long row of craters, located four km south-west of Svartsengi. Svartsengi and Eldvörp are thought to share a geothermal aquifer, which many claim to be fully exploited already. Thus even the smallest energy production would be unsustainable. Alterra Power still has plans to build a 50 MW power plant in Eldvörp, for which both research and utilization leaves have been granted. The planned plant is on land owned by the municipality of Grindavík, which apparently is about to finish the required land use plan enabling the project to take place.

The geothermal field is situated at the heart of the row of craters. There are only a few signs of geothermal activity on the actual surface, only fumaroles the lavafield and steam wisps when the weather is mild. One single borehole has already been constructed close to one of the craters at the centre of Eldvörp. It’s environmental impact is very limited compared with the impacts of the planned over-all drilling and the appendant pipelines, power lines, roads, powerhouse separator building. Such construction will have enormously destructive impacts on both natural and cultural relics in the area, including the row of craters and the Sundvörðuhraun lavafield.

Stóra-Sandvík

Stóra-Sandvík is a unique geothermal field in a coastal area close to the municipalities of Grindavík and Hafnir, as well as to the Reykjanesvirkjun plant, which in itself should be reason enough to move it from the exploitation category and instead to protection.

Krýsuvík

This geothermal area consists of four subfields — Sandfell, Trölladyngja, Sveifluháls and Austurengjar — which all connect to the same volcanic system, usually just named Krýsuvík. The geothermal activity is located at the margins of the system’s fissure swarms, while the Núpshliðarháls tuff ridge lies closer to its centre, with thousands of years old lava flats and eruptive fissures on both sides. Where the tuff has tightened due to geothermal transformations, small streams flow on to the lavafields and have thus created vegetated areas such as Höskuldsvellir, Selsvellir, Vigdísarvellir and Tjarnarvellir. As from the west of Hellisheiði, hardly any water runs on the surface of the whole Reykjanes mountain range, save the above-mentioned areas of Krýsuvík.

Interestingly, Krýsuvík is directly linked to what many consider to be the origins of environmentalism in Iceland. A geologist and environmentalist named Sigurður Þórarinsson, who had often voiced his concerns regarding Icelanders’ treatment of the country’s natural environment, had become seriously alarmed by what he witnessed by the Grænavatn maar in Krýsvík. It was, Sigurður said, used as a trash can for construction projects in the nearby area. At a meeting at the Icelandic Ecological Society in 1949, Sigurður suggested the creation of a legislation regarding nature conservation. Shortly afterwards, he was asked to take part in designing the legislation, which was passed in 1956 — the first in Iceland’s history. (Read about Sigurður Þórarinsson here.)

Out of the four Krýsuvík areas, the Energy Master Plan allows for the exploitation of Sandfell and Sveifluháls, while Trölladyngja and Austurengjar are supposed to be pending until the results of drilling in the two former areas are known. The National Energy Authority claims that these combined 89 km2 of land should have the production capacity of 445 MW of energy for 50 years, and as such be Iceland’s third most powerful geothermal field after the Hengill and Törfajökull areas. However, independent scientists and environmentalists have seriously questioned these figures, believing the area’s maximum possible production capacity to be 120 MW for 50 years.

Sandfell

Sandfell area is a semi-unspoiled volcanic area of lavafields and tuff mountains, large vegetated flatlands, and beautifully formed craters. It is a uniquely colourful area, which will be permanently altered if HS Orka’s planned 50 MW power plant will be built. The company has already been granted permission for test drilling and one borehole has been test-drilled, but no results have yet been published.

Sveifluháls (Krýsuvík)

Sveifluháls is a 20 km broad and 150 to 200 meter high compounded and mostly non-vegetated tuff ridge. The 2-3 km long geothermal area of fumaroles, mud springs and muddy hot springs — usually referred to as simply ‘the Krýsuvík geothermal area’ — lies a little east of the Krýsuvík fissure swarm. Despite drilling done in the second half of the 20th century, the area is relatively unspoiled and could easily be brought back close to its natural state. Due to the tuff transformation, the area is especially rich in colour and contains unusual geothermal salt deposits and gypsum. The area is unique due to its many maars, for instance Arnarvatn and Grænavatn (pictured above), of which some show signs of Holocene volcanic activity. Sveifluháls is a popular stopover as well as an outside school-room for geology. It also contains historical relics of human residence, as far back as Iceland’s original settlement.

There are plans to operate a 50-100 MW power plant in the area — a construction that would include somewhere between 10 and 20 boreholes, road construction, pipelines and power lines to connect the plant to the national energy grid. HS Orka has a research leave in the area but has not been able to guarantee the utilization rights, which are owned by the municipality of Hafnarfjörður.

Austurengjar

The geothermal area of Austurengjar is about 1.5 km east of lake Grænavatn — a relatively flat and mostly unspoiled area of mud pots, hot springs and dolerite ridges, which slopes north to lake Kleifarvatn. As a result of earthquakes in 1924, the geyser activity increased dramatically and since then, Austurengjahver has been the area’s most powerful spring. This colourful geothermal area is special as it lies completely outside of Krýsuvík’s volcanic system and shows no signs of Holocene volcanic activity. The plans for a 50 MW power plant at Austurengjar, including 10 to 15 boreholes and a whole lot of power lines, would directly impact the whole area and change the face of lake Kleifarvatn, which is today a wild and unspoilt lake, surrounded by mountains.

Trölladyngja

Trölladyngja is one of the three mountains (the other two being Grænadyngja and Fífavallafjall) that together make up the north-east end of a 13 km long tuff ridge called Núpshlíðarháls, which lies within Krýsuvík’s volcanic system. The geothermal area is about three km long and seems to be partly connected to extension fractures in the system. South of the mountains, a small stream called Sogalækur has shovelled out a considerable amount of clay and thus formed a colourful canyon called Sogin. The stream deposited the clay into the lava below and formed the vegetated field Höskuldarvellir. HS Orka has for many years had plans to build a power plant in Trölladyngja and three holes have been drilled already, resulting in very limited success but a lot of disruption. The Trölladyngja area is partly included in the Natural Heritage Register.

Protected Area(s)

Brennisteinsfjöll

Only one out of the peninsula’s nine potential energy generating areas will be protected if the Master Plan goes through parliament unaltered. Brennisteinsfjöll are a row of mountains, considered an impenetrable part of the Krýsuvík area, and do in fact constitute the largest untouched wilderness around the capital area of Reykjavík. As highlighted by Krater and Rose: “Wilderness areas are becoming rare globally, with over 83 percent of the earth’s landmass directly affected by humans, and the Icelandic wilderness is one of the largest left in Europe.”

Possible Targets for Protests and Direct Actions

The Ministry of Environment
Skuggasund 1
150 Reykjavík

The Ministry of Industry
Arnarhváll by Lindargata
150 Reykjavík

HS Orka
Brekkustígur 36
260 Reykjanesbæ

Jarðvarmi slhf
Stórhöfða 31
110 Reykjavík

Norðurál Grundartangi ehf (smelter and offices)
Grundartangi
301 Akranes

Norðurál Helguvík ehf (only offices)
Stakksbraut 1
Garður
232 Reykjanesbæ

Helguvík Smelter
See location on map here.

Century Aluminum Company (Corporate Headquarters)
2511 Garden Road
Building A, Suite 200
Monterey,
CA 93940
USA

For a list of more offices and smelter click here.

Alterra Power Corp. (Corporate Offices)
600-888 Dunsmuir Street
Vancouver, BC
Canada V6C 3K4

For a list of more Alterra Power offices click here.

Glencore International

Registered Office
Queensway House
Hilgrove Street
St Helier
Jersey
JE1 1ES

Headquarters
Baarermattstrasse 3
P.O. Box 777
CH 6341 Baar
Switzerland

_______________________________________________________

Main Sources

Áhugahópur um verndun Jökulsánna í Skagafirði, Eldvötn – samtök um náttúruvernd í Skaftárhreppi, Félag um verndun hálendis Austurlands, Framtíðarlandið, Fuglavernd, Landvernd, Náttúruvaktin, Náttúruverndarsamtök Austurlands (NAUST), Náttúruverndarsamtök Íslands, Náttúruverndarsamtök Suðurlands, Náttúruverndarsamtök Suðvesturlands, Samtök um náttúruvernd á Norðurlandi (SUNN), Sól á Suðurlandi. Umsögn um drög að tillögu til þingsályktunar um áætlun um vernd og orkunýtingu landsvæða. 11. nóvember 2011. (Download PDF here.)

Krater and Miriam Rose on behalf of Saving Iceland, “Development of Iceland’s Geothermal Energy Potential for Aluminum Production — A Critical Analysis”. In: Abrahamsky, K. (ed.) Sparking a World-wide Energy Revolution: Social Struggles in the Transition to a Post-Petrol World. 2010, AK Press, Edinburgh. p. 319-333. (Download PDF here.)

Various information from Náttúrukortið (The Nature Map) on the website of environmentalist NGO Framtíðarlandið (The Future Land).

Sigmundur Einarsson, Hinar miklu orkulindir Íslands, Smugan.is, October 2009.

Sigmundur Einarsson, Er HS Orka í krísu í Krýsuvík?, Smugan.is, November 2009.

Sigmundur Einarsson, Ómerkilegur útúrsnúningur iðnaðarráðherra, Smugan.is, November 2011.

Sigmundur Einarsson, Er HS Orka á heljarþröm?, Smugan.is, December 2011.

Catharine Fulton, Blame Canada? Geothermal energy, Swedish shelf companies and the privatisation of Iceland, The Reykjavík Grapevine, October 2009.

Catharine Fulton, Magma Energy Lied to Us, The Reykjavík Grapevine, May 2010.

Volcano Park to Open in Iceland? Iceland Review, July 2007.

Various information from the websites of Alterra Power, HS Orka and Norðurál.

May 06 2012

Back to the Future — The Unrestricted Spying of Yesterday… and Tomorrow?


By Snorri Páll Jónsson Úlfhildarson, originally published in The Reykjavík Grapevine.

This simply means that until spring last year, the police literally had a carte blanche regarding whom to spy on and for whatever reasons they chose. Unbeknownst the public, the instructions allowed unrestricted espionage.

“Good things happen slowly,” Björn Bjarnason, Iceland’s former Minister of Justice, wrote on his blog in March of last year when his successor in office, Minister of the Interior Ögmundur Jónasson, called for a press conference to announce that the police would soon be granted proactive investigation powers.

While Ögmundur and other Left Green MPs often criticised Björn for his aggressive efforts to increase police powers during the latter’s six years in office, he is now advocating for increased police powers as part of The State’s crusade against purported organised crime, which is believed to be predominantly manifested in a number of motorcycle gangs, including the Hells Angels.

A bill that he proposed to parliament last month does not contain the infinite investigation powers that the police have openly asked for, but does nevertheless allow them to start investigating people who they believe are planning acts that would fall under the category of organised crime and are punishable by at least four years of imprisonment.

While the case is usually presented as the police’s struggle to gain greater justifiable investigative powers — in which they have supposedly not fully succeeded — the fact is that, from at least July 1999 to May 2011, the police had unrestricted authority to monitor whomever they wanted due to poorly defined regulations. Read More

Apr 19 2012

“International Activists Criminalized”


Article by Jón Bjarki Magnússon, originally published on April 4th, in Icelandic newspaper DV. Translated from Icelandic by Saving Iceland.

German MP Andrej Hunko states that European police authorities are overtly and covertly planning increased surveillance of activists

Perhaps this is no longer common knowledge, but it still is a documented fact that the police authorities in the Western world operated in such a way throughout the whole of the 20th century.

“Though we have not yet managed to change the laws, we have managed to bring attention to the cause, which is very important.” So says Andrej Hunko who lately has been struggling against police spying on people involved with social movements in Europe. Hunko, who is a MP for the German left-wing party ‘Die Linke’, is concerned about the increased use of such espionage, especially as movements located on the political left wing are increasingly labelled as “leftist extremist and terrorists groups” that “have to” be monitored closely.

“I am concerned about this development. I am utterly opposed to the systematic criminalisation of international activists.” Among other things, Hunko, who is a member of the Committee on Economic and Monetary Affairs of the European Parliament, points out that plans are now being made to co-ordinate the laws of the member-states of the European Union, so that police spies from one country will be able to operate in another country without the special permissions that have been required. Hunko believes that this will subvert the work of social movements in Europe. “All this is happening very quickly and without an informed discussion, neither among members of national parliaments nor among members of the European Parliament, not to mention the public in those countries.” Read More

Náttúruvaktin