News

Dec 15 2008

No Enlargement in Straumsvík – Bakki Smelter Delayed


Rio Tinto Alcan has taken back it’s plan to enlarge it’s aluminium smelter in Straumsvík, Hafnarfjörður, according to the Icelandic newspaper Fréttablaðið. Alcoa’s planned smelter construction in Bakki (north-Iceland) will also be delayed for the next years. Landsvirkjun (national energy company) and Þeistareykir hf. have agreed to discuss with other interested buyers of geothermal energy in the north of Iceland.

Last Wednesday, Jacynthe Côté, Rio Tinto Alcan’s director, told Össur Skarphéðinsson, the minister of industry, that the company’s planned 40 thousand ton enlargement in Straumsvík would not take place. The enlargement was planned to take place in 2009, inside the company’s already declaired zone. The smelter’s production capacity would have raised from 185 thousand tons to 225 thousand tons.

Read More

Dec 13 2008

Direct action in Iceland


Aftaka.org – Since early this winter, Iceland has been facing economic crisis. The three major business banks have been nationalized, putting their dept on the people’s shoulders. People have been losing their livelong savings, loans have increased and are getting sky high (and for sure they already were high enough). 200 people lost their job, every single day of November and more and more people are facing the threat of losing their houses. Read more on Aftaka.org.

Nov 22 2008

Pepperspray used at anti-police protest


The now regular Saturday protests in front of the Icelandic parliament in Reykjavik went ahead today as planned, but a follow-up demonstration outside the police headquarters ended in the police using pepperspray. During the busy parliament protests, the famous statue of Jonas Sigurdsson was dressed in women’s clothing to remind people of the role of the female half of the population and how they should take a leading role in rebuilding the Icelandic economy.
After the rally, some 200 to 300 people took part in a different protest at the main police station to demand the release of Haukur Himarsson, who had been arrested last night when police found out he was the person to fly the Bonus supermarket flag from the top of parliament two weeks ago.
After officers in full riot gear used pepper spray to try to disperse the crowds, police eventually released Hilmarsson and the crowd dissipated. It is still not known whether or not the police charged Hilmarsson before his release, however.
Hilmarsson was arrested last night after an educational research trip to the Althingi parliament house. He has a suspended 14 days remaining of an 18-day prison sentence he received in 2005 for protests against the Karahnjukar dam.

Nov 11 2008

Alcoa’s shares down as production is decreased


Today Alcoa’s shares lowered 7,6%  after the company announced that it would decrease production by 350 thousand tons per year. The cut-down takes place in Alcoa’s smelters in Ferndale, Washington; and Baie Comeau, Quebec. Alcoa runs the Fjarðaál aluminium smelter in Reyðarfjörður, east Iceland. Earlier the company had announced 256 thousand ton cutback in Rockdale, Texas which means that Alcoa’s production downturn is 15%.
Alcoa also announced that a 2,2 million ton enlargement of an aluminium smelter in Wagerup, Australia would be delayed.  The project’s estimated cost was between 3 and 4 million dollars and Alcoa said it will restart when the state of market change. According to experts, there is still redundance of aluminium on the market.

Read More

Nov 11 2008

Búðarháls Dam and RT-Alcan Production Increase Delayed


Landsvirkjun, Iceland’s national energy company, has announced that the tender offer of the dam Búðarhálsvirkjun will be delayed because of the current economical situation. This means that the planned expansion of Rio Tinto Alcan’s aluminium smelter in Straumsvík will also be delayed. Construction of Búðarhálsvirkjun, which was stopped a number of years ago, will dam the Tungnaá River, close to the lake Langisjór.

The construction of Búðarhálsvirkjun is expected to be around 25 billion ISK and the 85 MW dam is supposed to power R.T. Alcan’s increased production in Straumsvík, Hafnarfjörður. R.T. Alcan hopes to increase its production by 40 thousand tons per year without enlarging the smelter. But the company also hopes to enlarge the smelter further, though the people of Hafnarfjörður voted against it in a 2007 referendum, or to construct a new smelter i Thorlakshofn. The dam is also meant to create power for Verne Holdin’s data center to be built in Reykjanesbær. Read More

Nov 02 2008

Alcoa Smelter in Bakki Delayed as Test Drilling is Postponed


Preperation for a new aluminium smelter in Bakki by Húsavík, has been delayed and the test drilling for geothermal power plants around lake Mývatn have been laid off. A memorandum of understanding between Landsvirkjun (Iceland’s national energy company) and Alcoa was not renewed now in the beginning of November as Alcoa is not ready to put more finance in to more drilling.
The Bakki smelter was supposed to be powered by geothermal plants in Þingeyjasýsla, near lake Mývatn. Four billion Krona’s worth of test drillings were scheduled for next year, both in Krafla and Þeistareykir. Alcoa was supposed to pay half of the cost. The decision on the future of the drilling will now be delayed for at least one year, according to a joint announcement by Landsvirkjun, Alcoa and Þeistareykir efh.

Read More

Nov 01 2008

Protests in Guinea – Direct Action Stops Bauxite Transport


In Guinea, West Africa, people have stopped trains from Compagnie des Bauxites de Guinee (CBG) that move bauxite from mines to the harbors. Bauxite is the major raw material for aluminium production and Guinea is the world’s biggest bauxite exporter. The protests started yesterday morning, October 31st and have been increasing since than.
Protesters have been seeking out officialdom´s houses, robbed them and put fire to many houses. At least one woman died during riots that resulted from the actions. Today, the protesters have managed to stop many  trains interrupting the transport of bauxite, which is the country’s biggest export product. Read More

Oct 27 2008

Protests in Reykjavik demand action


A number of protests have been taking place in Reykjavik, Akureyri and Seydisfjördur where several thousands of people attended and demanded action taken banks and that the prime minister and directors of the central bank would resign. Landsbanki flags were burned at one of the demonstrations on Saturday. Some protestors carried black and green and black and red flags and called slogans such as ‘Burn the banks’. [kml_flashembed movie="http://www.youtube.com/v/QUggaKTWlb0" width="249" height="212" wmode="transparent" /]

Oct 26 2008

Rio Tinto plans Orissa Mine and Refinery


INDIA – Unfazed by the global economic slowdown, international mining behemoth Rio Tinto is seeking to develop bauxite mines as a prelude to investing about $2.2 billion for a greenfield alumina refinery and 250.000 tonne smelter plant in India, its top official in the country said.
“We are interested in getting bauxite mines which may enable us to further the process of setting up the alumina refinery and smelter plant,” Rio Tinto’s India Managing Director Nik Senapati said while unfurling his company’s plans in the country. The London-listed company is believed to be the world’s biggest producer of alumina and aluminium. Read More

Oct 26 2008

Protestor Killed in Guinea Bauxite Mining Protest


CONAKRY, GUINEA – At least one person was killed when police in Guinea cleared protesters from a railway carrying bauxite for Russian aluminium company RUSAL, police and industry sources said on Friday the 10th of October. RUSAL, after it’s merger with Glencore, is the largest owner of Century Aluminum, which owns the Grundartangi smelter in Iceland and has been preparing to construct a new smelter at Helguvik, south of Reykjavik. The trains, which have been blocked for five days, had still not restarted, the sources added. Read More

Náttúruvaktin