News

Dec 16 2007

Icelandic Santas Cause Mischief in Hengill


santacrUpdate: check out the new ‘Potatoes for Heavy Industry’ film on YouTube. [In Icelandic and English]

On Saturday nine ‘jólasveinar’ wandered into the Hellisheiði Powerplant by Mount Hengill, expressing their opposition to the rise of heavy industry and other nature devastating activities in Iceland, as well as solidarity with human nature conservationists. (The jolasveinar are 13 Icelandic santas, born of a child-eating troll mother, who descend from the mountains in the days before christmas to sneak through the houses, stealing, teasing and causing mischief.) Read More

Nov 28 2007
1 Comment

Plans to Dam Farið River in Southwestern Highlands


Reykjavík Energy (OR) is examining the feasibility of harnessing Farid, a river that runs out of Hagavatn lake, south of Langjökull glacier in Iceland’s western highlands, and constructing a 30 to 40 MW hydroelectric plant there.

Farid would be dammed and another dam would also be constructed above Leynifoss waterfall, Morgunbladid reports.

The Ministry of Industry granted permission earlier this year for OR to examine this possibility and to see whether the prevention soil eruption and production of hydroelectric power could go together.

Employees of the Soil Conservation Service of Iceland have long considered damming the river to prevent soil eruption in the area since they believe it originates in the dried-up base of Hagavatn lake.

The Icelandic Institute of Natural History, however, believes that if Hagavatn lake is used as a reservoir, soil erosion from its base will increase in late winter and early summer.

Director of the Icelandic Tourist Association Ólafur Örn Haraldsson is against the plans. “A dam and a power plant will destroy one of the most spectacular land formation processes of Langjökull,” he said, adding the area is like an open and easily readable geology book.

Haraldsson said the area is becoming an increasingly popular hiking destination, which has the potential to become as popular as Laugavegur hiking route to Landmannalaugar, south Iceland.

Nov 27 2007

Will Iceland Get Another Exemption Under the Kyoto?


Iceland Review
11/27/2007

Minister of the Environment Thórunn Sveinbjarnardóttir says that every nation needs to be responsible after the Kyoto Protocol expires in 2012 and that special needs will not be relevant.

According to her, Iceland should not apply for further exemptions.

Post-Kyoto negotiations will take place at the 2007 United Nations Climate Change Conference in Bali, Indonesia, between December 3 and 14.

When the Kyoto Protocol was agreed upon, Iceland was given a special exemption to increase greenhouse gas (GHG) emissions by ten percent while most other nations were obligated to reduce their average emissions by 5.2 percent, Morgunbladid reports. Read More

Nov 26 2007
1 Comment

Big Time Trouble without Bitruvirkjun says Mayor


Hengill3

Active pools in the Hengill area (where Bitruvirkjun is planned)

From Fréttablaðið
26 November 2007

Ólafur Áki Ragnarsson, the Mayor of Ölfus, says the overwhelming negative stance of the town of Hveragerði will not have definite influence on whether the Bitruvirkjun power plant goes ahead. The power was earmarked for an Alcan Aluminium smelter in Helguvík. Read More

Nov 22 2007

Iceland’s Special Kyoto Deal Still Not Enough for Industrial Plans


7/11/2007

Prime minister Geir H. Harde has revealed his opinion that Iceland should negotiate for another special deal on carbon emmissions in the upcoming 2012 Kyoto agreement renewal. Read More

Nov 19 2007

Climate Change-Iceland: Emissions Quota Debate Heats Up


By Lowana Veal, Inter Press Service, 19 November 2007

“I am of the opinion that Iceland should not ask for a repeat of the Iceland Provision in the upcoming climate change negotiations,” says Iceland’s environment minister Thorunn Sveinbjarnardottir.
The Iceland Provision was the exemption given to Iceland when the Kyoto Protocol went into effect in 2005. Because Iceland derives 72 percent of its energy needs from renewable energy and had little heavy industry at the time the Protocol was agreed, the country was allowed to increase its greenhouse gas emissions by 10 percent from their 1990 level, rather than decrease emissions by at least 5 percent like most of the other signatories are required to do.
During the first commitment period, 2008-2112, the Iceland Provision allows for emissions averaging 1.6 million tonnes annually of carbon dioxide from energy-intensive industries that had not existed prior to 1990.
Read More

Nov 14 2007
4 Comments

Iceland’s Independence Hero Joins Curse Against Heavy Industry


curse1_small

On Friday night the 9th of November a dramatic and theatrical action took place outside the Icelandic parliament, in which politicians who voted for the environmentally disastrous Kárahnjúkar project, were ridiculed and cursed. The event marked the turning on of the power station and first turbines in Fljótsdalur on Monday the 5th, and serves as a reminder to the Icelandic government that we have not forgotten their corrupt behavior towards this unrivaled magical wilderness. Read More

Nov 10 2007

Indian Contacts


Mines Minerals and PEOPLE Excellent news section.

Photos from everyday life and resistance in Kashipur

www.kashipur.info

Nov 08 2007
1 Comment

Bitru and Hverahlíðar Power Plants Break Records in Negative Feedback


Hengill8

Geothermal waterfall at Klambragil in Reykjadal, Hengill area

Saving Iceland
8 November 2007

A new national record in criticizing a power plant has been set.

Following negative reports from environmental engineers, objections to the Bitru and Hverahlíð geothermal power plant expansion have grown to over 678. Residents, scientists and town authorities are concerned with how close the power plant is planned to be to the town of Hveragerði. They are also afraid that it will harm future tourism, and obstruct land for outdoor activities. Read More

Nov 08 2007

Hálslón Tunnel Leakages Poisoning Highlands


Tunnel Halslon

photo by Tom Olliver

Saving Iceland
7 November 2007

Only two days after the glorious inauguration of the turbines at Kárahnjúkar dam, further structural problems are already emerging.

Icelandic paper Morgunbladid revealed today that severe leakages in the tunnels leading to the turbines are releasing 200 litres of water per second onto the ground surface, forming a swamp currently about a third of a hectare in size. When asked to comment on the situation, Kárahnjúkarvirkjun spokesperson Sigurdur Arnalds said the water loss was of no consequence.

Regardless of whether or not we should believe Arnalds, the revelation that tunnel water is reaching the ground water breaches one of Siv Fridleifsdottir’s [ex-Minister of Environment who pushed through the project] fundamental stipulations (no. 14):
That Kárahnjúkarvirkjun should NOT interfere with ground water levels. Read More

Náttúruvaktin