May 19 2007

Victory over ALCOA in Brazil!

During a meeting today with the Pará State Secretary of the Environment, Valmir Gabriel Ortega, the State and Federal Public Prosecutors Offices requested cancellation of the environmental license granted to Alcoa to mine bauxite in the municipality of Juruti. In an exclusive interview with the Amazonia website, the coordinator of the State Public Prosecutors Office (MPE) Environmental Center, Prosecutor Raimundo Moraes, explained that the decision to request suspension aims at averting a violent reaction by the local population, which wants the company to leave at any cost, and also to conduct a rigorous review of the license.

Although mining operations are only scheduled to begin in 2008, during public hearings held on May 2nd and 3rd, the community claims that it is already suffering impacts from construction of lodgings for employees of the multinational, a port and a road.

Moraes said, “the impacts are so obvious that Alcoa has not denied any of them. Alcoa said it was correcting the problems and recognized that it does not enjoy good relations with the community”. Moraes, however, stated that the problems run deep and will not be set straight with just repairs.Impacts One of the main complaints raised at the hearings is contamination of the waters in rivers that flow through the town.

Technical studies detected the presence of feces coliforms in Jará Lake, which supplies water to the municipality, and data from the municipal health department show that cases of viral hepatitis, caused by ingesting water contaminated by human feces, jumped from 26 in 2006 to 121 in the first four months of this year. The community accuses Alcoa of not performing proper treatment on sewage from the lodging of its employees. Moreover, Incra representatives present at the meetings presented pictures and other documents that prove that the company is conducting deforestation in areas not authorized inside the Juruti Velho and Socó Agro-extractivist Settlement Projects.

Another complaint is the increased expenses of public agencies, which are faced with increased demands for health, education and infrastructure. “If, after the review is conducted, Alcoa can act correctly, alright, otherwise it would be best for them to leave, as we do not need to bear these costs. It is unfair that they keep the riches produced here and we keep the burdens”, says Moraes.

The prosecutor believes that the population has shown its lack of trust in the company and accuses the multinational of trying to upset the hearings. “They tried to co-opt leaders, offering 10 jobs to each community”.

License

The preliminary license for installation of the Alcoa plant was granted by the State Environmental Council (Coema) in 2005. At the time, the representative of the State Public Prosecutors Office (MPE) voted against the authorization. Soon afterward, the agency, together with the Federal Public Prosecutors Office (MPF), filed a class action suit petitioning for the suspension of the company’s activities in the region.

The hearings this week were attended by the coordinator of the MPE Environmental Center, Prosecutor Raimundo Moraes and Federal Attorney Daniel César Azeredo Avelino, who commands the (Federal Public Prosecutors Office (MPF) in Santarém. Members from both agencies also visited the affected locations.

By Renata Gaspar
Link: http://www.amazonia.org.br

May 10 2007

Routine Corruption Delayed Until After Elections!

BB

Bjorn Bjarnason

Read More

May 09 2007

Alcoa to swallow Alcan?

king?

Alain Belda CEO of Alcoa
President of Iceland in waiting?

Update: ALCAN prefered murderous Rio Tinto. So now its ALCAN – Rio Tinto. Nice addition to the corporate criminals that the Icelandic government like to wag their tails to. This indicates the true nature of Icelandic politics.

7 May 2007

Alcoa have announced plans to take over Canadian aluminium company Alcan, both companies own infamous smelters in Iceland: Alcoa in Reydarfjördur, Eastfjords, and Alcan in Hafnarfjördur, near Reykjavík.

An informal takeover offer amounts to nearly USD 33 billion (EUR 24 billion).

Bank of America recently upgraded its estimation of Alcan’s shares from USD 62 (EUR 46) to USD 82 (EUR 61) per share. Financial experts believe other aluminium companies may want to invest in Alcan as well.

Alcoa and Alcan have discussed cooperation for nearly two years, which has not been successful, thus Alcoa is planning a takeover.

According to information from Alcan in Iceland, the news about the takeover came as a surprise.

There have been persistent rumours that Rio Tinto is planning a hostile takeover of Alcoa.

Read More

May 02 2007

Environment Minister Bjartmarz Embroiled in Corruption Scandal

Bjartmarz

UPDATE: Voters booted Bjartmarz out of Icelandic politics in the general elections 12 May. But her track record is ugly and Icelandic nature will be smarting for a long time after her dark reign as Minister of the Environment. One of her final crimes against nature was to OK, against all scientific advise, a disastrous road scheme by lake Thingvallavatn in the Thingvellir National Park. This area is on the UNESCO World Heritage list for it’s unique nature. The plan is to build a motorway through the Gjábakka area, much too close to the lake. This road must be resisted and stopped. Read More

Apr 24 2007

Icelandic Government Begs ALCOA Not to Rock the Boat as Landsvirkjun do Not Deliver on Time

Aluminium production in Reydarfjördur begins... using energy from the national domestic grid!

Aluminium production in Reydarfjördur begins using energy from the national domestic grid!

As Saving Iceland and others pointed out a long time ago Landsvirkjun have proven not to be able to deliver energy to ALCOA on 1 April 2007, as specified in their contract with the multinational.

This is highly embarrassing for the Icelandic government and Landsvirkjun, especially as the general elections are coming and the contract they signed with ALCOA specifies that if the energy will not be available on time the Icelandic taxpayer will have to pay penalties to ALCOA.

Apparently the government have begged ALCOA not to mention any penalty payments before the general elections on 12 May. Some weeks ago we had the questionable pleasure to listen to denials in the press that these penalties were ever written into the contract! Yet again, this shows the level of lying that ALCOA and the Icelandic government are ready to stoop to.

Obviously, it is in the interest of ALCOA that the corrupt government which gave them the wilderness of Kárahnjúkar for free, will stay in power.

Aluminium was tapped from the first pot in the new aluminum smelter last weekend. The production process began mid-April.

However, there was a low key ceremony 1 April where the Icelandic PM and other dignitaries cut the red ribbon in the factory (above). But clearly the aluminium lobby felt that making too much of the occasion might backfire PR wise in view of the embarrassing fact that the energy was not coming from Kárahnjúkar, not to speak of the defeat ALCAN experienced in the Hafnarfjordur referendum the night before!

According to mbl.is, 40 pots are expected to be put into operation during this first stage and the smelter will be running 336 pots, its full capacity amount, by the end of the year when the construction of the smelter has been completed.

The smelter in Reydarfjördur has the potential to produce 356,000 tons of aluminum per year. The smelter currently uses 100 megawatts of electricity from the national electricity system, but will need 590 megawatts from the dams in Kárahnjúkar once electricity production begins there… later this year… That is; when Landsvirkjun and Impregilo have scrambled through the last tunnels at what ever the economical and human cost.

Until then, the smelter will not be fully operational and the Icelandic taxpayer will have to foot the bill when ALCOA needs more energy to stay on production schedule (after the elections one can presume!)

For the time being ALCOA hold their breath…

But what about when it comes to the final billing from the “most litigious company in history”, Impregilo?

How much is it going to cost the Icelandic taxpayer when Impregilo have worked out all the delays caused by the deliberately highly inaccurate calculations from Landsvirkjun?

To quote our own SOS: “The Kárahnjúkar project stands as a typical blueprint for international multi-billion-dollar megaprojects where promoters self-servingly misinform parliaments, the public and the media in order to get projects approved and built. The formula for approval is a cocktail of underestimated costs, overestimated revenues, undervalued environmental impacts and overvalued economic development effects.”

If we were not talking about Western Europe’s banana republic, then Icelandic politicians and technocrats who are responsible for this disastrous mess, would be made to answer for their actions in court… But of course, as every one in Iceland knows, they have already rigged the courts with their own family members and party lackeys! Read More

Apr 24 2007

Secret Agreement Reached on Energy Sale to Century in Helguvík

Nordurál (Century Aluminum) and Sudurnes Energy Company (Hitaveita Suðurnesja) signed an agreement yesterday on the sale of energy for Nordurál’s planned smelter in Helguvík on Reykjanes peninsula, west of Reykjavík.

According to the agreement, Sudurnes Energy Company will provide the Nordurál smelter in Helguvík with electricity; it will provide 150 megawatts for the first production stage, which could be used for producing 150,000 tons of aluminum. Read More

Apr 24 2007

Workers in Kárahnjúkar tunnels reduced to “licking the tunnel walls for water”

tunnel

UPDATE
24 April 2007

Around 180 subterranean workers have become ill from pollution at Karahnjukar and work in 14 km of the tunnels has been stopped by the Icelandic Health and Safety authorities.

High time that the Health and Safety finally did the work they are paid for!

Already in 2005 persistent reports started emerging from Icelandic workers that workers were being forced back into the tunnels by Impregilo way too soon after explosives had been used in them. This breaks all safety regulations.

Apparently Icelandic workers usually refused to go back in until it was relatively safe, but foreign workers had no choice and somtimes had to be carried unconcious back out of the tunnels because of the poisonous air.

Health and safety are now trying to hide behind a ‘lack of legislation in Iceland for this sort of tunnel work’.

The reluctance of the Icelandic unions and health and safety authorities to protect foreign workers at Karahnjukar suggests that there is something seriously rotten in more than one place in Icelandic society.

It seems appropriate now that there be more coverage in Icelandic media about the payments which Impregilo offered in 2003 to deposit in Icelandic union funds!

Exactly which unions received these payments from Impregilo?

Read More

Apr 23 2007

Reuters: Aluminium smelters generate hot debate in Iceland

By Sarah Edmonds
Mon Apr 23, 2007

REYDARFJORDAR, Iceland (Reuters) – Iceland’s biggest and newest aluminium smelter, Alcoa Fjardaal, pumped out its first hot metal at the weekend, riling critics who fear it will damage the environment.

The balance between environmental and economic tradeoffs for Iceland’s three existing and three planned smelters have become a major issue in the lead-up to May 12 elections.

On one side are those who fear unchecked industrial growth will harm the land and economy.

On the other are those who say Iceland must bring in such projects to make use of its abundant but unexportable power-generating resources, such as its geothermal and hydroelectric potential.

The issue has given rise to a new green party, the Iceland Movement, whose platform has a single plank: big industry development must stop for five years until the effects of projects like Alcoa’s Fjardaal are clear.

Author Andri Snaer Magnason said the construction of smelters like Alcoa’s, and the geothermal and hydroelectric plants that power them, has created a “heroin economy.” Read More

Apr 20 2007

Slick oil plans for Westfjords exposed as lying greenwash!

oil spill bird

As if the situation in Iceland was not ‘heavy’ enough these days, a profiteering ambassador (Olafur Egilsson) has come forth with plans to endanger the environment of the Icelandic Westfjords with a giant oil refinery. Not only is this incongruous in view of the recent announcement by the local authorities in the Westfjords that the area is to stay clean of all heavy industry but also because the perpetrators of this project are trying to sell it as “green” “high tech” industry, cunningly trying to avoid the ugly name heavy industry has with the majority of Icelanders.

There is nothing new about this sort of attempts of greenwash by the enemies of Icelandic nature, but this time INCA has exposed their lies.

In a statement released by INCA (Icelandic Nature Conservation Association) they have pointed out the inaccuracies in Egilsson’s and the Mayor of Isafjordur Halldorsson’s arguments in favor of the oil refinery. Egilsson, trying to sell his personally lucrative heavy liquid idea to the nation on a TV show, said that the pollution from oil refineries was only 1/100 compared with that from aluminium smelting and Halldorsson said that it was only 1/10 of the pollution from smelters.

Read More

Apr 20 2007

Does the Black Dog haunt ALCAN after referendum defeat?

Black Dog

17 April, 2007

A strange seal was spotted on the shore by Straumur near the ALCAN aluminium smelter. Its front flippers were deformed, so they looked more like dog feet.

“I have turned sixty and I thought I knew a thing or two about animals, but I never knew seals could have feet,” eyewitness Gunnar Örn Gudmundsson told Fréttabladid.

“I could hardly believe it when I took its picture. They looked like feet on a Labrador dog” Gudmundsson said, adding he believed the seal had been very tired and was resting on the shore.

“I was only about one meter away when it started hissing at me, it was probably completely exhausted,” Gudmundsson explained.

Is it surprising that the poor animal would be feeling a lot less than well and normal after having to swim in the polluted waters of a 240.000 tonnes aluminium smelter?

Read More

Náttúruvaktin