'Pollution' Tag Archive

Aug 17 2007
2 Comments

Plans for oil refinery in Westfjords


ArnarfjörðurThe local council in the westfjords yesterday gave their permission to build an oil refinery in the area, to “save the community from disintegrating since people are moving away.” They hope that a factory like this would interest young people in moving back to the area.
The likeliest place for the refinery would be Arnarfjordur, a place of tremendous beauty as most places in the westfjords are.
Scientists have pointed out that oceanic iceblocks may make the sailing route to the area unsafe for bigger ships. Also, a refinery of this size would pump one million tons of C02 into the atmosphere per year, which more than exhausts Iceland´s quota according to the Kyoto agreement.
Read More

Aug 13 2007

Voice of the Wilderness – The Saving Iceland Magazine


The first issue of Saving Iceland’s magazine Voice of the Wilderness (download pdf) introduces all the key issues and speakers at the Saving Iceland 2007 Conference.

Aug 10 2007
1 Comment

A letter to ALCOA from Dr. Ragnhildur Sigurdardóttir and Gudmundur Páll Ólafsson


“The hurt many of us feel towards the developments in eastern Iceland is so great that we will never accept another aluminum smelter to be built in Iceland. We would not be surprised if the environmental NGO’s and grass root organizations would consider the proposed developments in Northern Iceland to be a serious provocation on the behalf of Alcoa.”
Read More

Aug 06 2007

Beseiged by Illness Jarloop Residents Sue ALCOA


The Sidney Morning Herald
August 6, 2007

US environmental campaigner Erin Brockovich has joined West Australian residents to examine the merits of a court case against mining giant Alcoa.

About 160 Yarloop residents have complained of respiratory problems, skin irritation, sore throats and eyes, extreme fatigue, mental dysfunction, stomach upset, blood noses, cancers and organ failure in the last 11 years.

They claim emissions from Alcoa’s Wagerup refinery are causing the ill effects. Read More

Jul 22 2007

‘The Age of Global Protest’ by Sveinn Birkir Björnsson


Interview with Lerato Maregele and Attilah Springer
Grapevine.isIssue 10, 13 July, 2007

Attilah Springer is a journalist and an activist. She is a part of the Rights Action Group in Trinidad and Tobago, which has fought a long battle against Alcoa over aluminium smelters in Trinidad and Tobago. She recently spoke at a conference for Saving Iceland where she documented the progress of the struggle against the aluminium industry in her country. She is currently staying at the International Summer of Dissent protest camp, organised by Saving Iceland. A Grapevine journalist sat down to speak with Atillah at their beautiful campsite in Mosfellsdalur, joined by Lerato Maria Maregele, an activist from South Africa who has been organising protests against Alcan in her own country. Read More

Jul 22 2007
1 Comment

Elkem’s Icelandic Alloys Year Round “Human Errors”


Elkem

The Icelandic media reports today that Icelandic Alloys (Elkem) “accidentally” released a huge cloud of pollution from their plant at Grundartangi in Hvalfjordur. Apparently the accident was due to human error. The media quote Thordur Magnusson, an Elkem spokesman, saying that this human error “…recurs several times a week.”

Sigurbjorn Hjaltason, Chairman of the local Kjosarhreppur parish, confirms that Elkem usually produce the emissions during nights, when suitable, throughout the year. This is so that people will be less likely to become aware of the pollution they have to breath.

Similar nocturnal habits of ALCAN – Rio Tinto and Century – Rusal have been reported for years by the people of Hafnarfjordur and Hvalfjordur.

ALCAN – Rio Tinto, Century and Elkem seem to share the same conveniently systematic “human errors.”

Are we perhaps to expect that soon the PR departments of these three companies will be offering the population of South-West Iceland free sleeping pills to help them through their dark nights of heavy industry?

Jul 20 2007

Saving Iceland Invades Reykjavik Energy


Saving Iceland Invites Reykjavik Energy to Discuss their Ethics Publicly “STOP PRODUCING ENERGY FOR WAR”

REYKJAVIK – Saving Iceland’s clown army has this afternoon entered the head office of Orkuveita Reykjavíkur (OR, Reykjavik Energy) on Baejarhals 1. Simultaneously, protestors climbed onto the roof of the building unfolding a banner stating ‘Vopnaveita Reykjavíkur’ (Reykjavik arms-dealers). Saving Iceland demands that O.R. stop selling energy to the aluminium corporations Century and ALCAN-RioTinto. 30% of aluminium produced goes to the military and arms-industry (1).

Currently, O.R. are expanding the Hellisheidi geothermal plant at Hengill. “The goal of enlarging Hellisheidarvrikjun is to meet industries demands of energy,” states the Environmental Impact Assessment, particularly the Century expansion at Grundartangi and possible new ALCAN and Century plants at Straumsvik and Helguvik (2, 3).
Read More

Jul 18 2007

Saving Iceland Blockade Century and ELKEM Factories


Century smelterPress Release

GRUNDARTANGI – Saving Iceland has this afternoon closed the single supply road from Highway 1 to the Century/Nordural smelter in Hvalfjordur and the steel factory Elkem – Icelandic Alloys. Saving Iceland opposes the planned new Century smelter at Helguvik and the expansion of the Icelandic Alloys factory. Activists have used lock-ons (metal arm tubes) to form a human blockade on the road and have occupied a construction site crane.

Century Aluminum, a part of the recently formed Russian-Swiss RUSAL/ Glencore/SUAL conglomorate, want to build a second smelter in Iceland in Helguvik with a projected capacity of at least 250.000 metric tons per annum. The planned site is designed to accommodate further expansion. Grundartangi has this year been extended to 260.000 mtpa.

Currently, an environmental impact assessment (1) is under review for the Helguvik smelter, produced by the construction consultants HRV (Honnun/Rafhonnun/VST).

“It is absurd that an engineering company with a vested interest in the smelter construction could be considered to produce an objective impact assessment. The document makes absurd claims, such as that pollution is really not a problem because Helguvik is such a windy place that the pollution will just blow away,” says Saving Iceland’s Snorri Páll Jónsson Úlfhildarson.”

“This smelter will demand new geothermal power plants at Seltún, Sandfell, Austurengjar and Trölladyngju. In addition to the Hengill area which has already been seriously damaged by Reykjavik Energy. The impact assessment does not take these into account, nor the impact of the huge amount of power lines and pylons required. The plants will ruin the natural and scenic value of the whole peninsula. Also, the recquired capacity, 400 MW, exceeds the natural capactity of the geothermal spots, and they will cool down in three to four decades (2). And Century admits it wants the site to expand further in the next decades. So it is obvious that this smelter will not just ruin Reykjanes but also need additional hydropower.”

The impact procedure seems to be completely irrelevant anyway, since the company has completed an equity offering worth $360 million to be deployed for partly financing the construction of the Helguvik smelter project (3). This indicates that Century already has high level assurances that the project is to continue no matter what.

This completely contradicts the claims the new government of Iceland, and particularly it’s environment minister Þórunn Sveinbjarnardóttir, is opposed to new smelter projects.

Icelandic Alloys wants to expand its facility for producing ferrosilicon for the steel industry. It is in fact one of Iceland’s largest contributors to greenhouse gases and other pollutants (4).

“Expansion of Icelandic Alloys and Century considerably contribute to Iceland’s greenhouse emissions. If there are no further expansions of heavy industry beyond Grundartangi and ALCOA Fjardaal, Iceland will emit 38% more greenhouse gases than in 1990. If other expansion plans continue, levels would rise to an incredible 63% above 1990 levels. (5). That is completely irresponsible.

This shows that all the talk about ‘green energy’ from hydro and geothermal is, in reality, a lie. Icelanders have to rise up against these foreign corporations,” says Úlfhildarson. Read More

Jul 17 2007

Blackmail by Hengill


View from Hengill
July 18th 2007 a number of Saving Iceland activists made a courteous -first- visit to the Reykjavik Energy geothermal power station (Hellisheidarvirkjun), at Hengill volcano, to ask questions about the expansion of the geothermal power plant to provide electricity to aluminium smelters (Source: EIB). It is striking, that although the expansion of the Rio Tinto ALCAN smelter in Hafnarfjordur has been rejected by referendum, and other smelter projects in the south west are not definite, and the current Icelandic government says to oppose more smelters, Hellisheidi is still being expanded by Reykjavik Energy – at a cost of a whopping 379.06 million dollars. The Icelandic people are again blackmailed: once the expansion is completed, this will force Iceland into more smelters because the electricity needs to be sold to get investments back. The expansion must be stopped.

The Hengill geothermal area is one of the largest and most active geothermal zones in Iceland, with over 112 km2 of unique geological landscape featuring warm pools, hot springs and bubbling mud pools. The area is culturally and historically fascinating, located below and on the slopes of the dramatic Hengill volcano where travellers on their way to Reykjavik and Þingvellir have traced the ancient Cairns since Iceland’s first settlement. Þingvellir national park and Alþingi, the most precious Icelandic cultural landmark, can be seen from Hengill across the stunning lake þingvallavatn and stands to be affected by the developments here.

Geothermal Electricity
In addition to the existing geothermal boreholes and power plants at Hellisheiði, Reykjavik Energy has declared plans to vastly expand the number of boreholes and power stations in order to produce electricity planned Aluminium smelters at Keflavik and Hvalfjordur (Century) and an expansion to the Rio Tinto / Alcan plant at Hafnarfjordur. The implications of this exploitation are far-reaching.

  • Increased power generation means increased noise and industrial visual disturbance to this exceptionally rare and valuable landscape type.
  • Extraction of underground fluids leads to changes in groundwater movements, commonly including drying of unique hot springs and geysers and pollution of pure subsurface spring water.
  • Hot and toxic waste water is either disposed of by pumping it back into the borehole (as at Nesjavellir), commonly increasing the frequency of earthquakes in this very active fault zone, or it is pumped untreated into streams and lakes, wiping out valuable ecosystems as treatment is considered too expensive. The Northern end of lake þingvallavatn is already biologically dead in parts due to wastewater pumping and must be protected from more damage.

Green Energy?
RE and Landsvirkjun justify this tragedy under the guise of ‘green energy’, intended for the expansion of heavily polluting aluminium industry. The Aluminium industry is an environmental and social hazard from start to finish:

  • Mining of bauxite (raw Aluminium) destroys vast areas of tropical forest in Australia and the Amazon.
  • In the smelting countries, sulphur dioxide causes acid rain and potent greenhouse gases lead to climate change. 13 tons of CO2 are produced for every ton of aluminium.
  • The production process results in far more tonnage of pollution than aluminium, including fine red silt containing radioactive elements which cause cancer and silicosis in the developing countries in which they are mined.
  • Emissions of highly toxic fluorides poison fish and all other aquatic life.
  • After smelting, the aluminium is used to build cars, cans and planes and 30% of production goes to the military. ALCOA use the blurb ‘lighter, faster, stronger’ to advertise tanks, missiles, and F16s used to kill and maim civilians in Iraq and other controversial conflicts.
  • Smelters have a limited lifetime. They close after a few decades, leaving communities in disarray. This has happened in the US, in Suriname, Brazil, and many other countries. Geothermal plants are also limited in their lifespan. They are exhausted after a few decades, after which they need an unknown rest period.

Suggesting that Iceland has an ethical duty to sell all it’s energy possibilities, whether green or not, is an insult to our intelligence.

Change
In recent years the public consciousness against such damaging and outdated heavy industry has grown. In September 2006 15,000 people marched in Reykjavik and around the country as the exceptionally beautiful Karahnjukar highlands were finally and tragically drowned. For the third year, Icelandic and international activists have gathered in the wild of this incredible country to protest the blackening of this pure land by heavy industry. We welcome all those who share a love for nature and are willing to stand up against its destruction. Read More

Jul 17 2007

Saving Iceland Public Meeting in Thorlakshöfn


Public Meeting in Thorlakshofn

July 15th Saving Iceland held a public meeting with inhabitants of Thorlakshöfn, accompanied by Lerato Maregele from EarthLife South Africa, struggling against ALCAN, and Attilah Springer from Rights Action, Trinidad, struggling against ALCOA. They talked about similarities in the way these companies operate in their respective countries and Iceland. Concern was expressed about pollution, climate, and the way the aluminium industry abandons towns to waste when they will close smelters in a few decades. Thorlakshöfn is named as a new smelter location by Rio Tinto ALCAN, Norsk Hydro, Arctus/Altech and Down Corning. The mayor of Thorlakshöfn has suggested his town as a location for two new smelters.

Read More

Náttúruvaktin