'Krafla and Þeistareykir' Tag Archive

Nov 02 2008

Alcoa Smelter in Bakki Delayed as Test Drilling is Postponed


Preperation for a new aluminium smelter in Bakki by Húsavík, has been delayed and the test drilling for geothermal power plants around lake Mývatn have been laid off. A memorandum of understanding between Landsvirkjun (Iceland’s national energy company) and Alcoa was not renewed now in the beginning of November as Alcoa is not ready to put more finance in to more drilling.
The Bakki smelter was supposed to be powered by geothermal plants in Þingeyjasýsla, near lake Mývatn. Four billion Krona’s worth of test drillings were scheduled for next year, both in Krafla and Þeistareykir. Alcoa was supposed to pay half of the cost. The decision on the future of the drilling will now be delayed for at least one year, according to a joint announcement by Landsvirkjun, Alcoa and Þeistareykir efh.

Read More

Oct 21 2008

Test Drilling allowed by Krafla and Þeistareykir


The National Planning Institution (Skipulagsstofnun) has announced that test drilling can take place by Krafla and Þeisareykir in North Iceland, despite the joint Environmental Impact Assessment (EIA) being made for the construction of an Alcoa smelter in Bakki.
In July this year Þórunn Sveinbjarnardóttir, the Minister of Environment, decided that the joint EIA would have to include the planned smelter, the geothermal power plants that are meant to run the smelter, and the energy transportation. The decision has been heavily criticized by Alcoa and the aluminium lobby but celebrated by environmentalists. Some even think the EIA should include possible dams in Skjálfandafljót and Jökulsá á Fjöllum rivers, saying that the not enough geothermal energy can be produced for the size of Alcoa’s planned smelter.

Sep 05 2008

Skarphédinsson: No Impact Assessment Needed for Drilling for Alcoa


Minister of Industry Össur Skarphédinsson said at the Althingi (parliament) yesterday that experimental drilling in the geothermal area in northeast Iceland for the planned Alcoa aluminum smelter at Bakki near Húsavík should begin despite environmental assessment. Minister of the Environment Thórunn Sveinbjarnardóttir previously stated that Alcoa’s planned smelter at Bakki and the geothermal drilling that would power it need to be assessed as a whole. That may delay construction of the smelter. All of this is being discussed while there is already test drilling going on in Krafla ant Þeistareykir, which is proving highly destructive, as Saving Iceland reported earlier. Read More

Aug 22 2008

Bakki Impact Assessment Should Include Dams


Jaap Krater, Morgunbladid – Thórunn Sveinbjarnardóttir’s has said the environmental impact of Alcoa’s planned Bakki smelter and the associated energy production needs to be considered jointly (1). This poses the question whether or not new dams will be needed for heavy industry in the north. Looking at what can be realistically realised from geothermal plants, it becomes clear that a number of hydro projects will inevitably be necessary to power the Bakki smelter, and they should be taken into the assessment. In this article Jaap Krater analyses the energy calculations for the smelter and potential power plants. Read More

Aug 11 2008

Blowing up Mountains, Taking Drugs and Pink Toilets


Jaap Krater, Iceland Review – As someone who has been active with Saving Iceland for a number of years, I read James Weston’s column about media coverage on our campaign with much amusement. Many of his comments are not only funny but also have a ring of truth.
For me, they also illustrate something that is quite sad. People watch TV and see others chaining themselves to machines, according to polls most might even agree with them that they do not want more dams or smelters, and they get bored. Read More

Aug 10 2008

Impact of Test Drilling at Krafla


At Krafla and Þeistareykir test drilling is ongoing to prospect boreholes for the Alcoa smelter that is being planned at Bakki. At Krafla, drilling has started right into the Viti Vulcano. At Þeistareykir a large arsenic/sulphur lagoon has been accidentally created by the drilling. If these projects are allowed to continue, we will see large scale destruction of the landscape and biota as can currently be seen at Hengill.

Jul 25 2008
8 Comments

Saving Iceland Invades Landsvirkjun for Alcoa’s Severe Human Rights Abuses


PROTESTS AGAINST LANDSVIRKJUN’S PLANNED DAMS IN ÞJÓRSÁ RIVER AND THE CONNECTION BETWEEN LANDSVIRKJUN AND ALCOA

REYKJAVÍK  – Today 30 activists from the international campaign Saving Iceland have invaded the Landsvirkjun (national power company) building (Háaleitisbraut 68) to disrupt work. Earlier this morning Saving Iceland activists dammed the house of Landsvirkjun director Friðrik Sophusson and nailed an eviction notice to his door.

“We oppose Landsvirkjun’s intentions to build the four Þjórsá and Tungnaá dams for Rio Tinto at Straumsvik (1,2), despite the referendum. They are also negotiating to dam Skjálfandafljót and Jökuslá á Fjöllum for ALCOA’s planned Bakki smelter (3,4). This is on top of the mess they are making of Þeistareykir (5) and the deep drilling into Mount Krafla, right next to the tourist attraction. LV are doing this for a company that is a self-admitted arms dealer (6) and has been in the news again and again for it’s gross abuse of human rights. (7) This company should not be welcomed by Landsvirkjun,” says Jaap Krater from Saving Iceland.

Read More

Jul 10 2008

Energy Companies Destroying Þeistareykir


A recent exploration of the geothermal drilling sites in the North of Iceland by some members of Saving Iceland, uncovered shocking evidence of pollution and ecological damage at the Þeistareykir geothermal area near to Husavík.
Þeistareykir is one of three sites in the North currently being test drilled and researched to power the upcoming 250,000 tonne ALCOA smelter proposed at Bakki in Husavík. The area is about an hours drive from the main road down a rough track, and is located about half way between Husavík and Krafla (the biggest geothermal zone in the North, where extensive expansion to the current power plant is also taking place). Read More

Aug 19 2007
1 Comment

The Myth of an Aluminium Plant at Húsavík


Hrafnabjargafoss

Is the Energy on the Doorstep?

By Dr. Ragnhildur Sigurðardóttur

Many things have been said and written about plans for ALCOA´s aluminium plant at Bakki near Húsavík. One after another, important men have praised the idea and by now the only political parties not supporting it are the Iceland Movement and the Left Green party.
The propaganda of the supporters follows these lines: “utilise the national energy potential,” “the people of Húsavík have a right to an aluminium plant,” “the plant will only use energy drawn from the land nearby Húsavík, “damming of Skjálfandafljót and Jökulsá á Fjöllum is nothing but environmental propaganda”, “Geothermal energy has a low environmental impact”, “preparation work has been exceptionally well done.”
But how much truth do those slogans contain? Is there something more that needs to be looked into? Are the people of Húsavík, politicians included pushing the issues forward without really having looked at all the facts? Read More

Náttúruvaktin